Maximum Drilling Depth. Amazing Process. Bridge Construction

Sdílet
Vložit
  • čas přidán 16. 03. 2024
  • The bridge is under construction. The process involves such equipment as a drilling rig, an excavator, and a concrete pouring machine. Specialists are working. The video shows a large 120-foot-high column being drilled and placed into the ground. Very precise and perfect work.
  • Věda a technologie

Komentáře •