Pile foundation/ Construction of Bored Pile on field/ part 1
This technology can be used to construct foundation piles up to 4 m in diameter and 100 m deep.
Cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile.
The bored piles construction entails two main steps, the drilling phase (Demolition - Removal - Stabilisation) and the construction phase (Reinforcing cage - Casting - Curing)
The bored piles construction entails two main steps, the drilling phase (Demolition - Removal - Stabilisation) and the construction phase (Reinforcing cage - Casting - Curing
Cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile.
The bored piles construction entails two main steps, the drilling phase (Demolition - Removal - Stabilisation) and the construction phase (Reinforcing cage - Casting - Curing)
The bored piles construction entails two main steps, the drilling phase (Demolition - Removal - Stabilisation) and the construction phase (Reinforcing cage - Casting - Curing
zhlédnutí: 1 056
Video
What is Rebar? / Types of steel Rebar / Steel reinforcement bar
zhlédnutí 31KPřed 3 lety
7 Types of Rebar 1. Mild steel rebar 2. Deformed steel rebar a) TMT bar ( Thermo mechanically treated bar ) b) High strength deformed bar 3. Carbon steel bar 4. Epoxy coated steel rebar 5. Galvanized rebar 6. Glass-fibre-reinforced-polymer(GFRP) 7. Stainless steel rebar
FORMWORK & Types of Formwork / (Shuttering Work)
zhlédnutí 819Před 3 lety
Formwork : Formwork is temporary structural member which act as mould fora structure in which fresh concrete is poured. Types of Formwork 1. Timber formwork 2. Plywood formwork 3. Steel formwork 4. Aluminium formwok 5. Plastic formwork 6. Magnesium formwork 7. Fabric formwork #civilengineering #formwork #shuttering work #infrastructure
Milestone colour / Indian Highways / Milestone colour code in India
zhlédnutí 678Před 3 lety
Milestone colour code in india INDIAN HIGHWAYS National highways : Yellow and white colour State highways : Green and white colour District highways : Black and white colour Rural or village roads : Red or orange and white colour #indianhighways #colourcodingofmilestone #highwayengineering
Aggregate Crushing value test
zhlédnutí 11KPřed 3 lety
Apparatus : -A steel cylinder 15 cm diameter with plunger and base plate. -A straight metal tamping rod 16mm diameter and 45 to 60cm long rounded at one end. -A balance of capacity 3 kg readable and accurate to one gram. -IS sieves of sizes 12.5mm, 10mm and 2.36mm -A compression testing machine. -Cylindrical metal measure of sufficient rigidity to retain its from under rough usage and of 11.5cm...
Diaphragm wall construction / on site / Amazing technology of Foundation Engineering
zhlédnutí 54KPřed 3 lety
Diaphragm walls are one of the most important technologies of special foundation engineering. A diaphragm wall is constructed using a trench excavated in ground and supported by a mud fluids (typically bentonite or polimer mud) until the mud is replaced by concrete, after the steel cage installation. Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can b...
RCC Wall construction / Exposed RCC wall / RCC Wall construction by Hydra bucket
zhlédnutí 2,4KPřed 3 lety
#constructionwork #fieldwork #moderntechniques
Aggregate Impact Value Test/ Impact value test/ Determination of Aggregate Impact value
zhlédnutí 2,9KPřed 3 lety
Detailed impact test on aggregates with calculation of impact value is explained. Aggregate impact value range: 1) Less than 10% = Exceptionally Strong 2) 10-20% = Strong 3) 20-30% = Satisfactory for road surfacing 4) More than 35% = Weak for road surfacing APPARATUS : - Impact testing machine - Cylindrical measure - Temping rod - IS Sieve - Weighing scale - Oven #Impactvalue #aggregatetesting ...
Sieve analysis test of 10mm Aggregate / Gradation of coarse aggregate
zhlédnutí 22KPřed 3 lety
#civilengineering #materialquality #sieveanalysis Step by step process of sieve analysis test of 10mm coarse aggregate and calculation for its permissible limit. Instructor : Mr. Ashutosh Dwivedi Quality In-charge
Sieve analysis test of sand / how to check zone of sand ? / fineness modulus of sand
zhlédnutí 10KPřed 3 lety
Step by step process of sieve analysis test of sand and the calculation to check the zone of sand as well as the fineness modulus of sand #constructionmaterial #sieveanalysistest FINENESS MODULUS :: Fineness modulus of fine aggregate is 2.59. It means the average value of aggregate is in between the 2nd sieve and 3rd sieve. That means the average aggregate size is in between 0.3mm to 0.6mm. Lim...
Butt splice method / Threading of bar - How to extend bars on site ?
zhlédnutí 298Před 3 lety
#civil #moderntechniques
Plinth(Tie) Beam construction / Different methods of pouring
zhlédnutí 504Před 3 lety
#plinthbeam #pouringbyconcretepump #pouringbytowercrane
Silt Content Test for Sand
zhlédnutí 1,2KPřed 3 lety
#materialquality #silttestiing #siltcontentforsand
Cube Casting & Compressive Strength Test
zhlédnutí 595Před 3 lety
#cubecasting #concretequality #compressivestrength
RMC Plant Tour(visit) / how rmc plant work ?
zhlédnutí 617Před 3 lety
RMC Plant Tour(visit) / how rmc plant work ?
Manufacturing of bricks / clay brick / Traditional method of making bricks
zhlédnutí 52KPřed 8 lety
Manufacturing of bricks / clay brick / Traditional method of making bricks
nformative with practical knowledge, keep it up
Hi, the D-wall and Raft slab joint water tight???
जैसे 4.75 में सारा material पास हो गया 4.75 mm या उससे ऊपर के size के material को छोड़ कर। यही मतलब हुआ ना? ठीक इसी प्रकार 2.36 size इसी sieve में रह गया बाक़ी पास हो गया। ठीक इसी प्रकार 1.18 size इसी sieve में रह गया बाक़ी पास हो गया। ठीक इसी प्रकार 600 micron size इसी sieve में रह गया बाक़ी पास हो गया। यानी 599 mm तक पास हो गया। ये zone 2 वाली sand भी हुई। और इसके बाद 1 kg में से लगभग 506.5 gram माल 599 micron तक का हैं। सही मतलब समझा मैं ???
good information my friend!!
So we can welds every deformed rebar?
demonstrating the step-by-step guide and very useful resources out there bro.
Glad you think so!
So rebar means reinforced steel bar?
Correct!
Bhai yaise ki uthao cage ko cage ko uthane ke liye 2 crane chahiye hota hai jisko ham tendam lifting bolte hai aur jaha grubbing hota hai waha wire rop se badhte hai taki koi borivali me na gire aur sab safety se kaam karna padta hai bhai safety bhi dikhao baki sab theek hai
What was the weight of reinforcement cage for diaphragm wall
Isi ka business hai hamara
Really 👎, why u write ur title in English if u will talk in India??
Good
good information how many floors are there?
Very nice explanation... Sir how to get part 2 video
What is Safety measure
Thanks this information 🙏
Step by step installation , picture ke sathe bohutiii achha tha..Sir
Really informative vedio
Thank You so much 🙏😊
exlent sir iam civil supervisor
Kam milega
Good morning Sir
What isThe Differences Between B500A, B500B, and B500C
Thanks
Best👍
% weight of retained -pan = 0.9
Keep it up
Sir, please what is purpose of diaphragm with respect to dewatering. I’ll be glad if you explain this. Thank you sir
Perfect step by step Explanation and very Informative
How many meters excavated in 1 hour
Maximum partical size 20mm ya 12.5 mm
Thank you so much for your valuable information...Keep posting.
Diameter of pile we basically take??
great work
Agr 12.5 pr kuch material ruk jaaye tb kyaa hogaa, is sample ko fail kb declare krte hn.....????
How decided to use this sieves
Gradation back calculation solve
Sir Nice informative video about sieve analysis of 10mm coarse aggregate procedure and calculation.👍 But I have one question when passing % increase then the prescribed limit as per is code 383 than this aggregate usable in construction ? Any know about this Please tell me.🙏
Agar D wall ki length 40m ya usse jyada he to steel reinforcement ka cage he usko alag alag part me divide krke install krte he ya single part me he ??
Where is part 2 video
Thanks
Sir second part bhi daal ye iss video ka
Good
Where is part 2
Ye kese aate he 99.99btao sab fir 2.58 kese aate he batao sa
👌👌
Very nice video of testing
Very interesting and informative video
Nice info
great work