Saurabh Puttewar
Saurabh Puttewar
  • 13
  • 105 045
Controlled Blasting by using Electronic detonators @ Coal Mine, washery side - Solar Industries Ltd.
A Programmable Electronic Detonator consists of an electronic circuit which controls the delay timing of the detonator. The Microprocessor-based electronic circuit permits setting of variable delay timing. Each detonator has a unique detonator ID number allotted to it at the time of manufacture. Also, each detonator is provided with a unique tag number which acts as a detonator ID number. The electronic circuit has a digital timing circuit and an energy storage device, which will release the energy, only when the arm and then the firing instruction is given. The electronic detonator is connected to a connector by a Twin Copper/Copper coated steel wire. The micro logger can be connected to the twin Copper/Copper coated steel wire through the connector.
The Electronic Detonator is capable of providing :
• Accurate delay timing • Flexible delay timing • Safe and Robust in Handling • Reliability in use • Easy to use
Advantages :
• Better Vibration control due to more precise delay timing • Optimisation of fragmentation • Better control of rock movement • Better back break control Solar Industries India Limited
zhlédnutí: 456

Video

Controlled Blasting by using Electronic Detonator at Stone Quarry
zhlédnutí 2,8KPřed 2 lety
Electronic detonator Blasting, Controlled Blasting, Electronic Detonator, Explosives, Stone Quarry Blasting, Mining, Rock Blasting, Mines Blasting, Better Vibration control due to more precise Delay Timing, Optimization of Fragmentation, Better control of rock movement, Better back Break Control
Controlled Blasting at Limestone Mine with Bulk Explosive.
zhlédnutí 324Před 2 lety
Controlled Blasting, Drilling and Blasting, Modern Blasting Technology, Rock Blasting, Limestone Mining, Cement Sector, Dolomite Strata, Slow Motion Video, Mining Engineer, Technical Services, Solar Industries India Ltd, Use of Explosive, Detonators, Bulk Explosive, Nonel, Fragmentation, Ground Vibration, Controlled Flyrock, Blasted Profile.
Controlled Blasting - Blast at Limestone Mining (Slow Motion Video)
zhlédnutí 1,6KPřed 2 lety
Controlled Blasting, Drilling and Blasting, Modern Blasting Technology, Rock Blasting, Limestone Mining, Cement Sector, Dolomite Strata, Slow Motion Video, Mining Engineer, Technical Services, Solar Industries India Ltd, Use of Explosive, Detonators, Bulk Explosive, Nonel, Fragmentation, Ground Vibration, Controlled Flyrock, Rock Muckpile.
Blast at Limestone Mine - Dolomite Strata - Slow Motion Video
zhlédnutí 140Před 2 lety
Rock Blasting, Control Blasting, Limestone Mine, Dolomite Strata, Slow Motion Video, Mining Engineer, Technical Services, Solar Industries India Ltd, Explosive, Detonators, Bulk Explosive, Nonel, Fragmentation, Rock Muckpile.
Blast at Iron Ore Mines
zhlédnutí 29KPřed 4 lety
Blast at Iron Ore Mines
Blast at Stone Quarry
zhlédnutí 1,3KPřed 5 lety
Blasting, Stone Quarry, rock, explosive, mines, Nonel, non electric detonator
Blasting Practice @ Limestone Mines (Cement Sector)
zhlédnutí 43KPřed 7 lety
mine blasting, cement mines, limestone mines, detonator, anfo explosive, electronic detonator, rock, dumper, advance technology in mining .
Blast @ TISCO
zhlédnutí 368Před 7 lety
Electronic detonator Blasting, Control Blasting
Blasting @ Dudhichua mine, NCL
zhlédnutí 15KPřed 7 lety
mine Blasting, Rock Blasting, Blasting, Blast, NCL.
Blasting @ NCL mines
zhlédnutí 2,4KPřed 7 lety
mine blasting, rock blasting, blasting,
electronic detonator blasting
zhlédnutí 8KPřed 8 lety
electronic detonator blast, NCL , rock blasting, opencast blast, Solar Industries India Limited
electronic detonator blast
zhlédnutí 1KPřed 8 lety
electronic detonator blasting, Blasting, rock blasting

Komentáře

  • @paulcragg1315
    @paulcragg1315 Před měsícem

    The one with broken windows.

  • @vinaychouhan4886
    @vinaychouhan4886 Před 2 měsíci

    Hole depth???

  • @chamakmandal
    @chamakmandal Před 9 měsíci

    Bhai ek new technology wala video bana do this is very outdated

  • @kostaslekkas6806
    @kostaslekkas6806 Před rokem

    Πολύ πέταξε έχεις απολειες αερίου

  • @samuelliao9216
    @samuelliao9216 Před 2 lety

    Dear manager, Longyi New patented built-in classifiers dry grinding machines already put into mass production. 1.Powder from 325~4000mesh, fineness is adjustable 2.Built-in high efficiency classifier, no more investment cost for classifying system. 3.Smart PLC operation system, and integrated control system: 1 computer could operated max 6 machines, saving management cost. 4.No particle air pollution, more environment-friendly. 5.Compact structure to save factory space and lower foundation construction cost. For limestone The whole grinding system power is around 370Kw, the real working power is 80% 296KW 1.D97=23um (600mesh) Output: 10tons/h Energy Consumption: 29.6Kw/Ton 2.D97=16um(800mesh) Output: 8tons/h Energy Consumption: 37Kw/Ton 3.D97=10um (1250mesh) Output: 4.5tons/h Energy Consumption: 65.7Kw/Ton 4.D97=6.5um(2000mesh) Output: 2.5tons/h Energy Consumption: 118.4Kw/Ton For Talc powder, Longyi powder grinding mill power is 250Kw, the real working power is around 200~225Kw, including classifying system. A. D90=10.5~10.7um output: 4 tons/hour B. D90=9.8~11um output: 3 tons/hour It is suitable for processing nonmetallic minerals such as calcium carbonate, calcite, Kaolin, clay, barite, talc, gypsum, limestone, calcium oxide, bentonite, dolomite etc. Samuel MP/Wechat/whatsapp: +8615105956429

  • @rammeghwal1458
    @rammeghwal1458 Před 2 lety

    Sir, Basalt rock Deep hole 8mtr me kitane cartridges charge karna chahiye our stemming kitana karna....hai.. Explosives solar prime gold hai....

  • @vijay_paswan
    @vijay_paswan Před 2 lety

    Nice blasting

  • @technicalassistant5102

    Sir maine feb 2021 me offline mining mate ka form dala tha to mere exam kab hoga. Exam online hoga to kya form dubara dalana padega. Documents sara original bhej diya tha ab kaise milega online apply karne ke liye. Plz sir btaye.

  • @user-qx5ss7xd1j
    @user-qx5ss7xd1j Před 2 lety

    قَضَاءَ عَادَلَ . . . أَخْرَجَهُ اللَّهُ الْآن والحمدلله وَالشُّكْرُ لِلَّهِ . . وألحَمْدِلله وَألشُكْر لِلَّه أرَأء اعْمَلُوا بِعَدْلِه..".".".

  • @essyleslie9801
    @essyleslie9801 Před 2 lety

    phw74 #vum.fyi

  • @kashifazawar
    @kashifazawar Před 2 lety

    people watching this video to see actual blasting

  • @brijeshhverma
    @brijeshhverma Před 3 lety

    Dear Sir i am also a Mine Foreman (Restricted).... Recently i had received my certificate of Foreman...and now i am searching for a good Job....would u please help me out sir......🙏🙏🙏

  • @spurthichadharam9144
    @spurthichadharam9144 Před 3 lety

    I think total cost for ten years on cement or steel industry is more than his returns

  • @rakeshbobonga7094
    @rakeshbobonga7094 Před 3 lety

    How to minimize ground vibration and noise

    • @dexterrity
      @dexterrity Před rokem

      surest way is to be further from the blast :)

  • @shoebanzaarrazvi6379
    @shoebanzaarrazvi6379 Před 3 lety

    Ye konsi mines hy ki jagah hy

  • @rahulkumarsingh6565
    @rahulkumarsingh6565 Před 3 lety

    Hello sir dhudhichua project ka kitne saal ka tender hai bgr ka

  • @neerajmishra4502
    @neerajmishra4502 Před 3 lety

    Sir i diploma holder in mining engineering Mere pass overman certificate from dgms hai please tell me any job Please help sir

  • @aravindatchanr4694
    @aravindatchanr4694 Před 3 lety

    Hi sir.. last week I received export enquiry from Chittagong.. volume 20000 mt to 50000.. can you pls help me out.. I have no experience in break bulk.. my WhatsApp +919566720690

  • @asmabano1382
    @asmabano1382 Před 4 lety

    Well done...keep it up

  • @vijay_paswan
    @vijay_paswan Před 4 lety

    Good job

  • @rabaribhavesh1722
    @rabaribhavesh1722 Před 5 lety

    Sir any vacancy in mines Diploma in mining engineering 4 months experience in Western coal field in nagpur

  • @syedmuqeem801
    @syedmuqeem801 Před 5 lety

    Tandur, telingana

    • @samuelliao9216
      @samuelliao9216 Před 2 lety

      Dear manager, Longyi New patented built-in classifiers dry grinding machines already put into mass production. 1.Powder from 325~4000mesh, fineness is adjustable 2.Built-in high efficiency classifier, no more investment cost for classifying system. 3.Smart PLC operation system, and integrated control system: 1 computer could operated max 6 machines, saving management cost. 4.No particle air pollution, more environment-friendly. 5.Compact structure to save factory space and lower foundation construction cost. For limestone The whole grinding system power is around 370Kw, the real working power is 80% 296KW 1.D97=23um (600mesh) Output: 10tons/h Energy Consumption: 29.6Kw/Ton 2.D97=16um(800mesh) Output: 8tons/h Energy Consumption: 37Kw/Ton 3.D97=10um (1250mesh) Output: 4.5tons/h Energy Consumption: 65.7Kw/Ton 4.D97=6.5um(2000mesh) Output: 2.5tons/h Energy Consumption: 118.4Kw/Ton For Talc powder, Longyi powder grinding mill power is 250Kw, the real working power is around 200~225Kw, including classifying system. A. D90=10.5~10.7um output: 4 tons/hour B. D90=9.8~11um output: 3 tons/hour It is suitable for processing nonmetallic minerals such as calcium carbonate, calcite, Kaolin, clay, barite, talc, gypsum, limestone, calcium oxide, bentonite, dolomite etc. Samuel MP/Wechat/whatsapp: +8615105956429

  • @mohammadvaseem5227
    @mohammadvaseem5227 Před 5 lety

    How can purchase lime stone for mini plant

    • @bakchodvoiceover
      @bakchodvoiceover Před 3 lety

      7976499436

    • @muddasirsoudagar6235
      @muddasirsoudagar6235 Před 3 lety

      U can contact me 7892466106

    • @samuelliao9216
      @samuelliao9216 Před rokem

      Longyi super fine powder grinding machines advantages: 1. Powder from 48~4microns, fineness is adjustable 2. Built-in high efficiency classifier, no more investment cost for classifying system. 3. Smart PLC operation system, and integrated control system: 1 computer could operated max 6 machines, saving management cost. 4. No particle air pollution, more environment-friendly. 5. Compact structure to save factory space and lower foundation construction cost. For CaCO3 powder The whole grinding system including grinding, classifying, powder collector, fan, PLC cabinet, feeding conveyor and others, system working power is 296Kw 1. D97=23um (600mesh) Output: 10tons/h Energy Consumption: 29.6Kw/Ton 2. D97=16um(800mesh) Output: 8tons/h Energy Consumption: 37Kw/Ton 3. D97=10um (1250mesh) Output: 4.5tons/h Energy Consumption: 65.7Kw/Ton 4. D97=6.5um(2000mesh) Output: 2.5tons/h Energy Consumption: 118.4Kw/Ton It is suitable for processing nonmetallic minerals such as calcium carbonate, calcite, Kaolin, clay, barite, talc, gypsum, limestone, calcium oxide, bentonite, dolomite etc. Best wishes, Samuel Senior Business Development Manager Fujian Longyi Powder Equipment Manufacturing Co., Ltd Web: www.lymill.com Add: No.5, Lianfa Road, Dongxiao Economic Development District, Longyan, China Tel: +86-0597-2581699 MP/Wechat/Whatsapp: +86 15105956429 Email:Samuel@lymill.com

  • @amansinghchauhan7230
    @amansinghchauhan7230 Před 6 lety

    Which plant is this