O CELL TEST ( Bi -directional Static load test )(BDSLT ) اختبار تحميل الخوازيق بطريقه O CELL
The O-Cell test, short for Osterberg Cell test, is a method used to assess the load-carrying capacity of deep foundations, such as piles, drilled shafts, or caissons. Developed by Dr. Jorj Osterberg in the 1980s, this test is a significant advancement in pile testing because it allows for the measurement of both end-bearing and skin friction separately, rather than as a combined unit. Here's a detailed explanation of the test:
### 1. **Basic Concept**
The O-Cell is a hydraulically driven, high-capacity, sacrificial jack that is embedded within the foundation element (e.g., pile or shaft). The cell is placed at a predetermined depth during the construction of the pile. When the test is conducted, the O-Cell applies a bidirectional force within the pile:
- **Upward Force:** This force is exerted on the upper portion of the pile, mobilizing the skin friction along the pile shaft.
- **Downward Force:** This force is exerted on the lower portion of the pile, mobilizing the end-bearing resistance at the pile tip.
### 2. **Test Setup**
- **O-Cell Installation:** The O-Cell is placed within the pile at a specific depth during the concrete pouring or pile installation. The O-Cell is connected to hydraulic pressure lines that extend to the surface.
- **Instrumentation:** Load cells, displacement transducers, and strain gauges are typically installed along the pile to measure the forces and movements during the test.
### 3. **Test Execution**
- **Pressurization:** The O-Cell is pressurized using hydraulic fluid, creating forces that push upward and downward. The hydraulic pressure is gradually increased, applying load to the pile.
- **Load Measurement:** As the pressure increases, the load on the pile segments (above and below the O-Cell) is measured using the instrumentation. This data helps in determining the pile's load-displacement response.
### 4. **Data Analysis**
- **Skin Friction and End-Bearing:** The upward force tests the skin friction between the pile and the soil, while the downward force tests the end-bearing capacity at the pile's base. This allows engineers to analyze the load-carrying components separately.
- **Load-Displacement Curves:** The data from the test are used to plot load-displacement curves, which illustrate the pile's performance under increasing loads. Engineers can then determine the ultimate load capacity of the pile based on these curves.
### 5. **Advantages of the O-Cell Test**
- **Direct Measurement:** Unlike traditional static load tests, the O-Cell test directly measures the load-carrying capacity of the pile's components (skin friction and end-bearing) without requiring external reaction systems (e.g., kentledge or anchor piles).
- **High-Capacity Testing:** The O-Cell can apply very high loads, making it suitable for testing large-diameter piles and deep foundations that would be difficult to test using conventional methods.
- **Cost-Effective:** Since the O-Cell test does not require large reaction systems, it is often more economical, especially for large projects.
### 6. **Limitations**
- **Complexity:** The test setup is more complex compared to traditional load tests, requiring precise installation and instrumentation.
- **Interpretation Challenges:** The results from the O-Cell test can sometimes be challenging to interpret, especially in heterogeneous soil conditions, where the skin friction and end-bearing capacity might vary along the pile length.
### 7. **Applications**
- **Deep Foundation Design:** The O-Cell test is widely used in the design of deep foundations for buildings, bridges, towers, and other large structures.
- **Quality Control:** The test is also used as a quality control measure to verify the load-carrying capacity of piles after installation.
In summary, the O-Cell test is a powerful tool in geotechnical engineering, providing detailed insights into the performance of deep foundations. It is particularly valuable for testing high-capacity piles and for projects where traditional load testing methods are impractical.
zhlédnutí: 76

Video

checking water level inside piezometers for pumping testتحديد منسوب المياه داخل البيزوميتر
zhlédnutí 109Před 2 lety
checking water level inside piezometers for pumping testتحديد منسوب المياه داخل البيزوميتر
Micro piles execution sequence - طريقه تنفيذ الميكروبايل - اعادة تأهيل مستشفي جازان العام
zhlédnutí 245Před 3 lety
مشروع اعاده تاهيل مستشفي جازان العام تنفيذ الميكروبايل
شكل المواسير المستخدمه في الدفع النفقي tunnel Boring Projects
zhlédnutí 300Před 3 lety
شكل المواسير المستخدمه في الدفع النفقي tunnel Boring Projects
تنفيذ شافت بالتغويص shaft being construcred by sinking method .مشاريع تصريف الامطار
zhlédnutí 100Před 3 lety
تنفيذ شافت بالتغويص shaft being construcred by sinking method .مشاريع تصريف الامطار
تنفيذ manholes او shafts مشاريع تصريف السيول والامطار-مشاريع الثقب الأفقيshaft construction #نمبر1
zhlédnutí 173Před 3 lety
هذا الفيديو مقدمه عامه عن تنفيذ مشاريع تصريف السيول والامطار من نقطه البدايه وهي المانهول او الشافت الذي تتم فيه نزول ماكينه الثقب الأفقي لتنفيذ الدفع لمواسير التصريف بالاقطار المختلفه
شرح اختبار تحميل الخوازيق static pile load test
zhlédnutí 31KPřed 9 lety
اختبار التحميل الاستاتيكي هو اختبار خاص بالخوازيق للتاكد من قدره تحمل الخوزايق للحمل ولتحديد اقصي حمل يتحمله الخوزايق .تم تسجيل هذا الفيديو بتاريخ 26/1/2015 في جازان المملكه العربيه السعوديه كوبري دوار التوحيد. مهندس محمود عبداللطيف

Komentáře

  • @mahmoudadel7624
    @mahmoudadel7624 Před rokem

    استاذ ورئيس قسم كالعادة من استاذنا ومعلمنا الغالي .. وفقك الله وسدد خطاك وزادك من علمه ونعيمه ❤️

  • @mahmoudadel7624
    @mahmoudadel7624 Před rokem

    شرح وافي وكافي كالعادة يا باشمهندس محمود يا استاذنا الغالي ... ربنا يجزيك كل خير ويكرمك ويزيدك من علمه

  • @khalilnajjar2852
    @khalilnajjar2852 Před rokem

    ممكن طريقة الحسابات والشيت الخاص بيها

  • @mahmoudadel7624
    @mahmoudadel7624 Před 2 lety

    عاش بشمهندس محمود مهندسنا واستاذنا الكبير موفق دايما ان شاءالله ❤️

  • @user-uj9xb2tj2e
    @user-uj9xb2tj2e Před 2 lety

    انا مشرف عام حقن وبورد بايل

  • @user-oh7pk7dd7c
    @user-oh7pk7dd7c Před 3 lety

    مجهود رائع يا مهندس محمود .

  • @mohamedaziz502
    @mohamedaziz502 Před 4 lety

    أحلى أبو عبد الله ملك الخوازيق ❤️

  • @mannltp
    @mannltp Před 8 lety

    bore piles, good jobs what's the working load ?

  • @mahmoudelsayed5592
    @mahmoudelsayed5592 Před 9 lety

    يجب الا يتجاوز الهبوط الهبوط المسموح به في الخوازيق وهو ١٥ مم طبقا للممواصفات بوازه النقل بالمملكه العربيه السعوديه .وعليه اذا زاد الهبوط يتم زياده عدد الخوازيق او قطرها او طولها لكي تتحمل الحمل الواقع عليها

  • @user-hv1vw9ir9d
    @user-hv1vw9ir9d Před 9 lety

    سلام عليكم .شرح ممتاز ,ومختصر جداً تسلم يا هندسة ياريت لو توضح لنا قيمة الهبوط المسموح به وطريقة تسجيل القراءات علي الفورم ( Record for Pile Loading Test )وكيفية حساب النتائج جزاك الله كل خير

  • @user-ko4jt5lg1o
    @user-ko4jt5lg1o Před 9 lety

    شكران شرح جميل و واضح

  • @ahmdalaaedin
    @ahmdalaaedin Před 9 lety

    شكراً يابشمهندس