How much insurance should a Chemical Plant buy?
This is a simple question with nuanced answers. First, develop hypothetical scenarios to guide the worst-case assessment. Once a scenario is chosen, we model it by inputting technical data into computer models, helping us estimate potential damage from the event. After identifying the possible damage, we can apply facility valuations to calculate a total damage estimate. Be aware of complications that may disrupt an MFL or Valuation study. Follow 10 steps to create an exceptional Loss Valuation Study.
zhlédnutí: 99

Video

Solar Summer School 2024 - The Year of Fire and Ice
zhlédnutí 110Před 14 dny
I went to 4 solar plants in three weeks I also went to the Renewable Energy Testing Center in San Jose Ca. I learned about Wildfires, PV Fires and how Hail Stow systems are working all across the US. I spoke with Operators, Maintenance Techs, Insurance company engineers, Researchers, Underwriters, a CFO, and Risk Manager. Click on the link to hear what they said about solar plant operations and...
Jurisdictional Objects for Beginners
zhlédnutí 130Před měsícem
Gain a basic understanding of what Jurisdictional Objects are and how we ensure the safety of boilers and pressure vessels in the energy industry. Learn how an effective inspection process flows. Hear real life stories of vessel inspection incidents.
Solar Facility Security & Public Safety
zhlédnutí 59Před měsícem
Learn why it is important to warn the visitors or neighbors of solar facilities of the high voltage hazards inside. In this video, you will hear actual accounts of electrical injuries when basic precautions were not followed. We also discuss the basic elements of protection that an owner or operator should be aware of. Stay to the end to learn about the most important tell tale that something b...
Fire Protection Challenges in Chemical and Power Plants - and how to overcome them
zhlédnutí 219Před 2 měsíci
Learn about the common issues uncovered by an effective inspection, testing and maintenance program for Fire Protection systems in Chemical and Power Plants. Learn how to discover impairments and component failures. We discuss strategies to not disrupt operations while performing tests. Find out the most common "pitfall" of accurate documentation and record keeping. Help ponder the stock photo ...
Process and Power Boiler Risks and how to manage them.
zhlédnutí 185Před 3 měsíci
New risk engineers can learn the basics of boiler risk management. Learn about real world events that drive the need for the rest of the video which will cover the types of boilers, the damage mechanisms as well as techniques to reduce risk. The best is served up first in this video. It's several actual boiler loss stories. Stay past the adds to learn how to prevent the losses and grow as risk ...
Ice Rink sub-floor Heating system failure
zhlédnutí 147Před 3 měsíci
Learn how LNG tanks and Ice rinks have a common issue of keeping the ground from freezing. Learn how ice rinks work and how a failure can be understood. Watch as an adjuster changes his position after seeing how the events unfolded.
Thermal Power Plant Preservation & Decommissioning
zhlédnutí 104Před 4 měsíci
Learn about the special hazards created during the transition from Operational to decommissioned for thermal power plants. Learn what thermal power plant systems must be laid up for an idle plant. See real world examples of demolished fossil plants. Learn from real world examples of reactivation of large, combined cycle power plants.
Subject Matter Experts for Energy Risk Engineers
zhlédnutí 81Před 4 měsíci
Come learn how to interview Subject Matter Experts during Risk Engineering surveys. Learn how to prepare for the interview. Stay for the bonus material to get a great method to determine if the SME is really an expert. Enjoy.
Battery Energy Storage Systems for Risk Engineers
zhlédnutí 349Před 4 měsíci
Learn the basics of battery energy storage systems (BESS). Understand how battery management systems protect batteries from electrical abuse. See real world applications and real lessons learned from the installation of BESS to store energy and use it later. Perfect for renewable, less than reliable sources. Fundamentals, Lessons Learned and Real Event stories. Come along and don't forget to co...
Mechanical Integrity for Risk Engineers
zhlédnutí 186Před 4 měsíci
Come along as we explain the basics of mechanical integrity programs in energy facilities. We discuss the benefits of MI programs and how to build and develop your own. We show examples of Mechanical Integrity Failures from the Chemical Safety Board. We even us AI to help understand the common lessons learned from industry catastrophes.
Risk Engineering Marketing Plans for Energy Companies
zhlédnutí 72Před 5 měsíci
In this blueprint for presenting your company's risk to insurers we break it down into simple pieces. After the Executive summary we jump into the real meat. Describing the purpose and structure of the Risk Engineering reports, then highlighting the significant findings and risk mitigation efforts. Next, we move into the corporate and fleetwide risk improvements that are rarely captured in the ...
Solar Power for Risk Engineers
zhlédnutí 407Před 5 měsíci
Come along our journey of Risk Engineering. In this video we will learn the basics of a solar power plant and then learn what Risk Engineers are looking for when they visit. Feel free to add suggestions for these risks in the comments.
How to manage large Power and Chemical Plant Insurance Claims
zhlédnutí 264Před 6 měsíci
Get a detailed look at how a large power or chemical plant property damage claim flows. Learn the steps to take after a loss. What to expect from adjusters and how to work with the accountants and engineers. Not too heavy on the policy wording, but enough to show the difference between Off-the-shelf policies versus manuscript policies. Plain language for the Plant Managers who have never been t...
Power Generator Risks - for Risk Engineers, Underwriters and Brokers
zhlédnutí 404Před 6 měsíci
Come learn what CAN happen to power generators in power and chemical plants. From shorted end turns to failed coolers. Hear real life examples of what has happened in industry. Then move into generator risk management, where we discuss how to prevent all of the damage we just discussed. A great primer for risk engineers. Cool pictures for Underwriters and Brokers.
How I Survived 26 Underwriter Meetings in 4 Days as an Engineer
zhlédnutí 156Před 7 měsíci
How I Survived 26 Underwriter Meetings in 4 Days as an Engineer
Hydrogen Manufacturing Risk Management
zhlédnutí 260Před 7 měsíci
Hydrogen Manufacturing Risk Management
LNG and LPG Vapor Clouds for beginners
zhlédnutí 279Před 7 měsíci
LNG and LPG Vapor Clouds for beginners
Lube Oil System Risks in Chemical and Power Plants
zhlédnutí 248Před 8 měsíci
Lube Oil System Risks in Chemical and Power Plants
Understanding Annual Fire Pump Test Results
zhlédnutí 1,6KPřed 8 měsíci
Understanding Annual Fire Pump Test Results
Taking the worst deal on purpose - and liking it!
zhlédnutí 94Před 8 měsíci
Taking the worst deal on purpose - and liking it!
Risk Engineering Pitfalls - How to avoid bad inspections
zhlédnutí 374Před 8 měsíci
Risk Engineering Pitfalls - How to avoid bad inspections
Wind Turbine Risks for Risk Engineers
zhlédnutí 204Před 8 měsíci
Wind Turbine Risks for Risk Engineers
Risk Engineering averts a Billion Dollar Stack Collapse
zhlédnutí 70Před 9 měsíci
Risk Engineering averts a Billion Dollar Stack Collapse
Risk Based Fire Barrier Analysis - How to decide to build
zhlédnutí 338Před 9 měsíci
Risk Based Fire Barrier Analysis - How to decide to build
Prioritizing Risk Management Recommendations: What's worked for me.
zhlédnutí 166Před 9 měsíci
Prioritizing Risk Management Recommendations: What's worked for me.
Power Transformer Risk: What You Need to Know Before It’s Too Late
zhlédnutí 336Před 9 měsíci
Power Transformer Risk: What You Need to Know Before It’s Too Late
How to read an Energy Risk Insurance Policy
zhlédnutí 274Před 9 měsíci
How to read an Energy Risk Insurance Policy
What Risk Engineers look for in Chemical and Power Plants...
zhlédnutí 445Před 9 měsíci
What Risk Engineers look for in Chemical and Power Plants...
What are Property Risks in Energy Facilities?
zhlédnutí 174Před 9 měsíci
What are Property Risks in Energy Facilities?

Komentáře

  • @michaeljperron
    @michaeljperron Před 18 dny

    Excellent content here. Every insurance risk engineer involved in renewable energy risks should watch this!

  • @charlesworrell5946
    @charlesworrell5946 Před měsícem

    Very easy to understand! Good information! I will watch again to reinforce learning. Thanks Chuck Worrell FireSafetyConcepts

  • @budstep7361
    @budstep7361 Před měsícem

    14:45 what a nightmare, I hope you all had the proper LOTOs in place! Who would guess the janitor would pull the power, not realizing the open vessel...

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před měsícem

      It was before those days. I was lucky. That plant did have a confined space fatality. It was a rescuer who died. Everyone lost track of him while they were working on the original victim.

  • @budstep7361
    @budstep7361 Před měsícem

    This was great--thank you for sharing your industry experience!

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před měsícem

      It’s my joy. I have had the best career and learned so much. Getting it all out is fun.

  • @EdMan102292
    @EdMan102292 Před 2 měsíci

    This is some incredible content. So interesting to see high quality overviews of other engineering disciplines.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 2 měsíci

      Much appreciated! I have been fortunate to gain lots of experience through the years.

  • @erdevendra
    @erdevendra Před 2 měsíci

    Hi John, thanks for another interesting video. What shall be the priority of recommendations like inspection related item first or management system related or hardware related changes ?

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 2 měsíci

      In my experience we found the priority sometimes depended more on the “cost to implement” versus the driver of the project. Inspections, management or hardware, I think it always depends on risk reduction per dollar spent. I’m sure that is a myopic way to see it.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před měsícem

      Great question! In my experience, because the cost of implementation is usually lower, procedure revisions and training recommendations can have great risk reduction per $ spent. Capital projects are challenging to justify especially if revenue impact is smaller than the expected property damage. When no business income insurance is purchased, all of the risk is retained and should be addressed.

  • @hosemonster
    @hosemonster Před 3 měsíci

    Great video and explanation! Reach out to Hose Monster if anyone has questions on how to perform a test.

  • @alowry2002
    @alowry2002 Před 4 měsíci

    Thank you. Excellent thinking to determine that is the one leak. Regarding brittle fracture or fatigue fracture in my opinion it doesn't matter. Such a failure and the resultant claim occur when it is discovered. That can be the time of the noted leak or when a piece of equipment is opened for inspection. I have seen that line of thinking held up in court in Canada, the UK, and the USA. Please keep these videos coming.

  • @Guilherme-jh2hj
    @Guilherme-jh2hj Před 4 měsíci

    Pretty good video. Appreciation from Brazil

  • @dennisseretny6228
    @dennisseretny6228 Před 4 měsíci

    I test a fire pump that consistently has a high churn pressure (140 PSI plus as compared to the factory churn of 116 PSI) The 100 % is always around 90% of the factory 104 PSI at 94 PSI and then the bottom falls out at the 150% point (Factory at 87PSI to the annual test pressure of 58PSI which is well below the 90% requirement). This is a vertical turbine pump with a raw water source. Normally I get a -3PSI for the supply pressure as the water level is usually around 6.5 ' from the surface of the water to the C/L of the discharge on the pump. The curve on the graph is always convex instead of concave. Would you be able to direct me to a corrective coarse of action that would help resolve this. The pump rating is 1,000 GPM @ 104 PSI with 1770 RPM. My RPM readings are around 1785 at churn, 1777 at 100% and 1774 at 150%. Yes, I do have my gauges calibrated annually.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 4 měsíci

      Dennis, thanks for the great questions. Can you get a borescope inspection of the bowls? The experience I have with VT fire pumps is that either a blockage of weeds and branches formed or one or more of the lifting bowls was damaged or missing. In those days we pulled the vertical impeller. Possibly a borescope would give you confidence to look elsewhere or actually find an issue.

    • @dennisseretny6228
      @dennisseretny6228 Před 4 měsíci

      Thanks for the insight, once I get consent to proceed, I'll get back to you on the results.

  • @JoseIgnacioMeneses
    @JoseIgnacioMeneses Před 4 měsíci

    Great info! Question about the flange guards, Should they be a FM approved?

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 4 měsíci

      FM has skin in the game so I trust their approvals more than labs paid by manufacturers. Even if they are not approved they are better than nothing.

  • @2009dwine
    @2009dwine Před 4 měsíci

    Thanks that was amazing. Can you please make a video on what an insurer should look for a thermal power plant which is under preservation.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 4 měsíci

      Great topic! I’ll get started.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 4 měsíci

      It’s in the works. It will have the precautions for preservation, maintenance, restoration and a section comparing decommissioning versus preserving.

    • @2009dwine
      @2009dwine Před 4 měsíci

      @@EnergyRiskEngineering Wowww….that content covers whatever I can think of related to preservation. Thank you again for all your efforts. Much appreciated

  • @SEBZAID
    @SEBZAID Před 4 měsíci

    I really appreciate it. This videos are so good. Greetings from Colombia.

  • @josemarilacsamana4036
    @josemarilacsamana4036 Před 4 měsíci

    I'm new to Risk engineering. Thanks for sharing very informative things here on your channel.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 4 měsíci

      Welcome aboard! Enjoy the content. Let me know what else you’d like. 😁

  • @alowry2002
    @alowry2002 Před 4 měsíci

    Thank you. This is a growing area and much information is being shared especially on LinkedIn and industry publications. Those involved in these systems need to be following those areas to key up to date.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 4 měsíci

      These systems become more sensitive to electrical assault as they age. The BMS systems are critical. LifePO4 is great. Price is coming down too.

  • @MMAli-nj8xl
    @MMAli-nj8xl Před 5 měsíci

    What if corrected test result shows that test curve is above the pump OEM curve...what is the interpretation for such result? will 5% apply to going above the OEM curve as well?

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 5 měsíci

      The NFPA 25 committee was not concerned with pumps performing above the curve. They weren’t even interested in meeting the largest system demand. The manufacturers reps on the committee were just looking for a way to monitor wear on the impellers. (Check that the driver is at an appropriate RPM.) The 5% was never about reducing risk. Risk was never discussed. Where did it come from? It was made up.

  • @NickGobin
    @NickGobin Před 5 měsíci

    Great video and good points. A few thoughts: - wind stow should not be flat. Flat panels will catch the wind like an airfoil and develop oscillating motion (torsion on the tracker torque tube). This leads to galloping - look up a couple decent losses from a big name tracker OEM in Australia that occurred well below design wind speed. So even though it's counterintuitive, wind stow is now usually designed the same as hail - fixed at max angle. This is still debated from the perspective of windborne debris, but with significant windborne debris you are going to have a bad day no matter what. - checking for debris that can become windborne missiles (both on property and neighbouring properties) is a good idea on loss control surveys. - vegetation management is the key for wildfire mitigation. Glass-glass panels (usually bifacial) are a little more resistant. Fire response plan is actually really crucial, because close coordination is required with utility staff to keep responders safe from electric energy hazards. Some owners use various other strategies including long-duration biodegradable fire retardants applied around solar farm perimeters during fire season. - for microcracking, the only global OEM of thin film panels (First Solar) claims they are immune to microcracking, and have pretty compelling data, explanation, & policies to back it up. It's probably not enough to change procurement decisions, but definitely something to highlight. Finally - I love your thoughts on 2x 66% capacity step-up transformers. It's an approach I also endorse and recommend. With the capacity profile of most solar plants, a single 66% capacity transformer is usually enough to capture >85% of revenues!

  • @ahmedalbuaimi
    @ahmedalbuaimi Před 5 měsíci

    very useful explaination

  • @alowry2002
    @alowry2002 Před 5 měsíci

    If one is to use animals for vegetation management one can't use goats. As you noted not only will then eat everything including wires they will also climb onto panels. Sheep are the way to go as they don't climb and limit their eating to grass. I have seen a few sites with successful sheep operations.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 5 měsíci

      Thanks for confirming. Sheep it is.

    • @alowry2002
      @alowry2002 Před 5 měsíci

      @@EnergyRiskEngineering my Caribbean client has had good success with sheep. They built the farmer a stable rated for a Cat 4 storm. My Florida client has moved away from sheep to groundskeepers.

  • @tduross
    @tduross Před 5 měsíci

    The only time I would apply affinity would be with a variable speed controller (VFD-PLD) because speed is what i is but also how well the mfgr matched the driver to the pump.

  • @IAmMRToon
    @IAmMRToon Před 5 měsíci

    Great insight sharing for engineer society. Keep doing sir.

  • @alowry2002
    @alowry2002 Před 5 měsíci

    Thank you for the account. Wow. Bypass a permissive on the crane and then create an impairment on the AS. Hmmm so much for the nuclear safety cornerstones of strict adherence to procedures and conservative decision making. I hope you do a video on the plugged toilet that caused a 400 MW coal fired boiler to blow up in MO.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 5 měsíci

      Hawthorn. I know the Fire Protection Engineer involved with the rebuild. Very similar but the nuke won’t explode. 😁

  • @alowry2002
    @alowry2002 Před 5 měsíci

    Yes there isn’t an exclusion for mistakes. If there was most claims wouldn’t get paid. The Engineer who wrote that report needs to learn what Sudden and Accidental means for a machinery breakdown claim.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 5 měsíci

      He actually needs to sit for his insurance license if he keeps using policy language to make arguments.

  • @alowry2002
    @alowry2002 Před 5 měsíci

    Thank you. Excellent points. I assume that there was no BI cover for this generating station. The flammable liquids behind you need to be stored in a UL rated cabinet, AS added to the combustible structure, and please confirm that the exterior lightning is connected to a GFI outlet. 😉

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 5 měsíci

      You should check out my video on the Eastern European Bomb Shelter at a power plant. Built for 1500 people. You decide…

  • @alowry2002
    @alowry2002 Před 5 měsíci

    Thank you. When you said they wanted to consider it wear and tear I laughed. That wasn't wear and tear. Good move not arguing over $20,000.

  • @alowry2002
    @alowry2002 Před 5 měsíci

    Excellent video thank you.

  • @alowry2002
    @alowry2002 Před 6 měsíci

    I haven’t watched the video yet but I’m going to guess a GE, now ABB, Type U bushing made in the 🇺🇸. The 🇨🇦version doesn’t have same paper insulation issue.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 6 měsíci

      Thanks for the feedback. Could it be a Trench?

    • @alowry2002
      @alowry2002 Před 6 měsíci

      @@EnergyRiskEngineering it could also be a type O. There are a number of bushings out there with lost histories and the details of the application, factory, and test history are important. Even bushings without a history fail as I have seen. Especially bad over 230 kV. I have the porcelain from a U bushing that looked like that on my desk.

  • @CarlosPhilpot
    @CarlosPhilpot Před 6 měsíci

    A great Explanation thank you.

  • @parthchaudhary8993
    @parthchaudhary8993 Před 6 měsíci

    Excellent information, under COP28 a number of counties pledged to invest over a trillion dollar by 2030. I am also planning to further pursue PHD in Clean Hydrogen Technologies especially around the production of affordable sodium borohydride (NaBH4) as a hydrogen carrier.

  • @erdevendra
    @erdevendra Před 7 měsíci

    Intresting

  • @BigD-utah
    @BigD-utah Před 8 měsíci

    This may be the best and most effective explanation of risk around and I've borrowed from John's presentation for my own presentations. Thanks, John.

  • @erdevendra
    @erdevendra Před 8 měsíci

    Insightful, nice logo

  • @Lev-Heart
    @Lev-Heart Před 8 měsíci

    Your lube oil video was condensed, clear, and packed with knowledge. Thanks to you

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 8 měsíci

      Thanks for the feedback. I know my material won’t fit into a “Short” 😁 Glad you enjoyed it!

  • @BigD-utah
    @BigD-utah Před 8 měsíci

    A great explanation. The only thing to add is that the fire pump alarm signals and controller functions must be tested as well per NFPA 25. Almost no one does that.

  • @lazarusakhagbosu371
    @lazarusakhagbosu371 Před 8 měsíci

    Thank you sir.

  • @erdevendra
    @erdevendra Před 8 měsíci

    This was really amazing,

  • @EnergyRiskEngineering
    @EnergyRiskEngineering Před 8 měsíci

    Thank you. Every plant should watch 😅

  • @parthchaudhary8993
    @parthchaudhary8993 Před 8 měsíci

    Very informative 👍

  • @parthchaudhary8993
    @parthchaudhary8993 Před 8 měsíci

    Excellent content and kudos to the hard work you put in, I can guarantee that your channel will grow and surely be the best in the Engineering Risk Management Industry!

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 8 měsíci

      Thanks for the compliments and encouragement! Great fuel for motivation!

  • @parthchaudhary8993
    @parthchaudhary8993 Před 8 měsíci

    Excellent and very informative👏👍, thank you so much for sharing it. Really interesting to understand risk perception and factors affecting psychological and behavorial aspects of it. It is extremely important that one understands that the risk tolerance level and appetite differs from person to person and it plays a significant role in evaluating risks.

  • @EnergyRiskEngineering
    @EnergyRiskEngineering Před 8 měsíci

    Wow! Thank you for the thoughtful questions. The make and model of Gas Turbines especially is important as they are all generally still research projects when they are built. Mechanical issues can be model specific. There are certain large power transformers that may have design defects. As for the Halon system. We had a $50K protection system for a $10K building. Refilling the Halon would cost more than burning down the little building. When we have a useless system, it doesn’t matter if it works. It should have been removed. Thanks again for the input. Would you be interested in me interviewing various Risk Engineers to find out how they got started and what they like about Risk Engineering?

    • @swapnilkireet
      @swapnilkireet Před 8 měsíci

      Yes why not, I would love to share my stories from India stint & how different I found the UK market

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 8 měsíci

      @@swapnilkireet are you on whatsapp?

  • @swapnilkireet
    @swapnilkireet Před 8 měsíci

    Hi John I am a junior Risk Engineer working in the UK. I thanks you for sharing the video & kudos to you for making such content. I had a few questions though: 1. Why make & model of equipment are required by the underwriter ? I mean a transformer or motor capacity is enough with records to show periodic maintenance. Since the equipment is being used in a factory, it will be from a standard company (reputed/reliable brand). We can always highlight if something is non standard but mostly people dont cut corners with such equipment 2. The European Engineers fire door insight, was he not wrong that the halon would not work as intended due to the lack of pressure with open gate. I can get back to you on this. A few of the pitfalls I have been part of, while I was working in India: Unorganised inspection with poor coordination. I once went in a visit where 4 other Engineers were expected, apart from myself. When I was about to complete the inspection, I crossed the other group which had arrived at a different time & with other site contact altogether. So yes these things does happen.. 2. During my meetings, I used to call a person from health & safety, maintenance & production so that any requirement could be coordinated. PS: Thank you once again for the video. I was trying to message you on LinkedIn (request pending) but I could not due to lack of premium subscription.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 7 měsíci

      Sorry for not replying better, sooner. Underwriters considering multi hundred million dollar risks cannot rely on the good “intentions” of anyone designing, installing, operating or maintaining that equipment. Their actions must be documented. Make and model of Gas Turbines etc. matter because there are well known manufacturing defects in their equipment. The OEMs regularly issue Technical Information Letters or Service Bulletins for their equipment based on lessons learned from fleet issues. If we don’t know what model the equipment is, we don’t know what service bulletins apply. If we don’t know what bulletins apply, how do we know if the machine has been updated based on the fleet issues that caused the TIL to be issued? We don’t. So we get the make and model of all large equipment. Some engineers like to know the serial numbers too. Not me.

  • @lazarusakhagbosu371
    @lazarusakhagbosu371 Před 9 měsíci

    Thank you

  • @lazarusakhagbosu371
    @lazarusakhagbosu371 Před 9 měsíci

    Thank you very much for the videos. Please, don't stop doing this. I just started my career in risk engineering and the videos are just the perfect learning path for me.

  • @dilburt2
    @dilburt2 Před 9 měsíci

    Great video series thanks! Can we have a video on risks associated with renewable power assets ie wind, solar, battery etc

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 9 měsíci

      You asked and being a man of the people, I delivered. Check out my latest video. 😁

    • @dilburt2
      @dilburt2 Před 9 měsíci

      Legend! Thank you.

  • @digitaldaemon74
    @digitaldaemon74 Před 9 měsíci

    Do the transformer core also have internal temperature F.O. sensors? If they have core temperature detection, why is external detection for deluge actuation? Rather than heat detection or LHD?

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 9 měsíci

      The deluge systems need to detect fires from other transformers. There are some cases where we want the water not to flow on a burning transformer.

  • @kristenmunno6930
    @kristenmunno6930 Před 9 měsíci

    Awesome video 🎉

  • @pavanmohan9098
    @pavanmohan9098 Před 9 měsíci

    Your videos are really good... Thank you for such wonderful and useful videos.

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 9 měsíci

      Thank you. I have been sick but getting better. I have a great story ready. It’s about how we almost had a $1B Stack Collapse.

    • @mgrueni
      @mgrueni Před 9 měsíci

      The videos are great. And this is an interesting topic. Did you ever try to set up a wall of concrete blocks. They are easy to create and to handle them. czcams.com/video/80t5LMtqr7Q/video.htmlsi=O_K0tgIfPSysE6fU

  • @digitaldaemon74
    @digitaldaemon74 Před 9 měsíci

    Is the tracking of fire pump performance over time always a linear degradation? Does that % of degradation accelerate over time, does the pump get to the point in it's lifetime where as the pump gets closer to it's life need more frequent testing?

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 9 měsíci

      The wear depends on the use. A coal plant that washes down once per week won’t cause the same wear as a temporary (permanent) connection to the fire system for equipment cooling. Our electric pumps are not meant to run all the time. That why we have jockeys. Now I see plants that just get bigger jockey pumps instead of fixing the underground. Wear varies. If we watch it we will be in better position to make decisions.

    • @digitaldaemon74
      @digitaldaemon74 Před 9 měsíci

      @@EnergyRiskEngineering Makes sense. Thanks.

  • @digitaldaemon74
    @digitaldaemon74 Před 9 měsíci

    What are the typical schedules for travel like for a broker engineer. I understand there's a lot of travel, but how much in a month or week?

    • @EnergyRiskEngineering
      @EnergyRiskEngineering Před 9 měsíci

      In the world of energy, the broker engineers are lucky to only have two trips per month. Where it gets tough is if you support claims. They never call to see if we are available first.