NiagaraTimber
NiagaraTimber
  • 4
  • 33 685
New buildings take shape at Niagara
Always on the go and continuing to grow, Niagara is pleased to see progress on two new buildings under construction at the Kennington site.
These massive buildings are set to house Niagara’s expanding remanufacturing plant and timber storage and have required approximately 330 concrete truck deliveries to complete the foundations.
The remanufacturing building (closest to the time lapse camera) is 131m x 54m which is 7074m2. This is bigger than a rugby field with 54m clear span trusses and is set for completion by the end of June 2017.
The timber store building is 137m x 34m, which is 4658m2 and is on track to be completed by the end of May 2017.
In total (for any oldies out there) the land occupied between the two buildings is almost three acres!
Watch this space as these buildings progress throughout the next few months.
zhlédnutí: 99

Video

ENVIRA WEATHERBOARD CLADDING COMMERCIAL
zhlédnutí 197Před 7 lety
Envira Weatherboard System by Niagara New Zealand. The best timber cladding solution for your home.
Southland New Zealand logging movie
zhlédnutí 33KPřed 10 lety
Log Marketing New Zealand Ltd demonstrates tree felling and logging of sustainable radiata pine plantations in Southland New Zealand during 2014.
Niagara above the tree tops NZ
zhlédnutí 782Před 11 lety
View above a beautiful radiata pine plantation in Southland New Zealand

Komentáře

  • @StumpjumperVideosPA
    @StumpjumperVideosPA Před 9 lety

    great video ! coming over to nz next feb or march would love to visit a site !

    • @jollyroger246
      @jollyroger246 Před 7 lety

      I watched Southland full movie here twitter.com/092b218741a3ce3e4/status/824454109713428481