Megaken Hub Limited
Megaken Hub Limited
  • 10
  • 19 118
10KVA, 10KWA Inverter System
Complete Solar Installation at AIBEN Group Gwarimpa of 10KVA inverter and 10KWA Lithium ion battery. 15 Solar panels in 3S5P configuration capable of delivering 1.9KW/H and a total of 11.4KW/Day at 6 hours of sunshine.
zhlédnutí: 28

Video

Conference Audio microphone set and visual display set installation.
zhlédnutí 19Před rokem
Installation of complete set of audio visual conference and lecture presentation wide screen display and 24 units chairman wireless infrared conference microphone systems installed for Presidential Committee on Small Arms and Light Weapon (PRESCOM SALW) head office at Maitama district Abuja.
20KVA, 58KWA Solar/ inverter installation completed
zhlédnutí 414Před rokem
20KVA, 58KWA Solar/ inverter installation completed
Procurement process for my upcoming Panel Construction
zhlédnutí 20Před rokem
Procurement process for my upcoming Panel Construction
My experience as one of the captives in the Kaduna bound AK9 train attack in 2022
zhlédnutí 22Před rokem
It's exactly one year today since we were adopted by Boko Haram in the Kaduna bound AK9 train. Please subscribe to my channel @kvswit for this videos I'll release to go viral and reach many audience.
Part 1. Gear Switch and Changeover Installation.
zhlédnutí 4,1KPřed rokem
The 630A Gear Switch is for cutting off the mains incomers supply for maintenance purposes, the 400A changeover switches between the two generators G1 and G2 while the 630A changeover switches between the mains and the resultant generator output of G1 and G2.
From 5 to 10 crates per day in 4 days
zhlédnutí 3,8KPřed rokem
Layers improvement ratio after 4 days
Flomitch Farms eggs sorting process.
zhlédnutí 10KPřed rokem
We specialized in fish, meat and egg for consumption.

Komentáře