![Humble Solar Wala from Hiba Trading SMC-PVT Ltd](/img/default-banner.jpg)
- 234
- 218 876
Humble Solar Wala from Hiba Trading SMC-PVT Ltd
Pakistan
Registrace 21. 01. 2012
It's Humble Ahmed
working with the Solar power Generation Since 2016 in Pakistan.
Before I was working in KSA in Saudi Oger for 10 years in Preventive maintenance department as a controller, was additionally assigned QMS Coordinator, was heading 300+ team of professionals which includes Engineers department heads and supervisors.
Was also heading planning and scheduling process for the whole year.
Last working site was King's Official Residential Palace in Buraidah Al-Qassim Central Region.
Was responsible to assign Preventive maintenance tasks to the following departments categorically (pre planned maintenance system).
HVAC
Water Treatment
Plumbing
Pumps and Hydrolics
Power Generation
High Voltage
Medium Voltage
Low current
Electronics
Telecommunications
Housekeeping
Landscaping
Fire and safety
R & R
Came on vacation in April, 2017 but during my vacation was known that the Saudi Oger company got closed by the government.
Well that was the reason I didn't went back to KSA.
working with the Solar power Generation Since 2016 in Pakistan.
Before I was working in KSA in Saudi Oger for 10 years in Preventive maintenance department as a controller, was additionally assigned QMS Coordinator, was heading 300+ team of professionals which includes Engineers department heads and supervisors.
Was also heading planning and scheduling process for the whole year.
Last working site was King's Official Residential Palace in Buraidah Al-Qassim Central Region.
Was responsible to assign Preventive maintenance tasks to the following departments categorically (pre planned maintenance system).
HVAC
Water Treatment
Plumbing
Pumps and Hydrolics
Power Generation
High Voltage
Medium Voltage
Low current
Electronics
Telecommunications
Housekeeping
Landscaping
Fire and safety
R & R
Came on vacation in April, 2017 but during my vacation was known that the Saudi Oger company got closed by the government.
Well that was the reason I didn't went back to KSA.
Solar project commissioning completed with Inverex nitrox 12kw inverter & Lithium Power wall 10kw
Solar project commissioning completed with Inverex nitrox 12kw inverter & Lithium Power wall 10kw
zhlédnutí: 61
Video
During commissioning of 80kwh Lithium iron Phosphate battery bank with Nitrox 36kw
zhlédnutí 73Před 2 měsíci
During commissioning of 80kwh Lithium iron Phosphate battery bank with Nitrox 36kw
8kw Solar power Commercial based project site tour installed in Cattle Colony Bin Qasim Karachi
zhlédnutí 56Před 2 měsíci
8kw Solar power Commercial based project site tour installed in Cattle Colony Bin Qasim Karachi
8kw solar project site tour
zhlédnutí 26Před 2 měsíci
8kw Solar Project Site tour Installed at Cattle Colony Bin Qasim Karachi
8kw Solar Project Site tour Installed at Cattle Colony Bin Qasim Karachi
zhlédnutí 27Před 2 měsíci
8kw Solar Project Site tour Installed at Cattle Colony Bin Qasim Karachi
36kw solar project commissioning during Installation
zhlédnutí 38Před 2 měsíci
36kw solar project commissioning during Installation
8kw Solar power residential based project Maxpower hybrid with ziewnic 200amp lithium iron phosphate
zhlédnutí 374Před 2 měsíci
8kw Solar power residential based project Maxpower hybrid with ziewnic 200amp lithium iron phosphate
AC/DC Earth resistance checking via earth resistance meter
zhlédnutí 57Před 3 měsíci
AC/DC Earth resistance checking via earth resistance meter
150kw solar Project Site under commissioning
zhlédnutí 67Před 3 měsíci
150kw solar Project Site under commissioning
AC/DC Earthing for Solar Project in Karachi
zhlédnutí 71Před 3 měsíci
AC/DC Earthing for Solar Project in Karachi
18kw Solar project by Humble Solar Wala
zhlédnutí 813Před 4 měsíci
18kw Solar project by Humble Solar Wala
65KW Solar Project by Humble Solar Wala for Feed Mill or Chakki
zhlédnutí 127Před 4 měsíci
65KW Solar Project by Humble Solar Wala for Feed Mill or Chakki
12kw Hybrid Solar Project with Nitrox, longi & Lithium Iron Phosphate Battery
zhlédnutí 361Před 5 měsíci
12kw Hybrid Solar Project with Nitrox, longi & Lithium Iron Phosphate Battery
18kw Solar Project completed with Nitrox 6kw x 3 and Longi Himo 6 Solar panels
zhlédnutí 79Před 6 měsíci
18kw Solar Project completed with Nitrox 6kw x 3 and Longi Himo 6 Solar panels
10kw Solar Project for 5000 Gallon R.O Plant
zhlédnutí 84Před 8 měsíci
10kw Solar Project for 5000 Gallon R.O Plant
Solar Site survey of 8kw Nitrox, Himo 6 Solar Panels and 200-AH Lithium iron phosphate battery bank
zhlédnutí 120Před 8 měsíci
Solar Site survey of 8kw Nitrox, Himo 6 Solar Panels and 200-AH Lithium iron phosphate battery bank
8kw Solar power for residential based system installation and commissioning completed
zhlédnutí 42Před 8 měsíci
8kw Solar power for residential based system installation and commissioning completed
Alhamdulillah 20kw On-grid Solar project commissioning completed in DHA phase 6, Karachi
zhlédnutí 234Před 11 měsíci
Alhamdulillah 20kw On-grid Solar project commissioning completed in DHA phase 6, Karachi
AC/DC Earthing installation for 20kw Solar Project in DHA Karachi
zhlédnutí 136Před 11 měsíci
AC/DC Earthing installation for 20kw Solar Project in DHA Karachi
solar project with Nitrox 3kw along with Jinko 545 X 6 for small shop
zhlédnutí 251Před 11 měsíci
solar project with Nitrox 3kw along with Jinko 545 X 6 for small shop
6kw SOLAR ENERGY PROJECT with 6kw MATRIX ALONG WITH Jinko 545 X 12 COMPLETED
zhlédnutí 133Před rokem
6kw SOLAR ENERGY PROJECT with 6kw MATRIX ALONG WITH Jinko 545 X 12 COMPLETED
6kw Nitrox with Jinko 545watts X 12, Alhamdulillah working exclusively
zhlédnutí 177Před rokem
6kw Nitrox with Jinko 545watts X 12, Alhamdulillah working exclusively
Alhamdulillah 66kw Solar Energy project completed with Trina 650watts solar panels
zhlédnutí 216Před rokem
Alhamdulillah 66kw Solar Energy project completed with Trina 650watts solar panels
Nitrox 12kw Solar Hybrid Inverter with Trina Solar panels, Commissioning completed Alhamdulillah.
zhlédnutí 203Před 2 lety
Nitrox 12kw Solar Hybrid Inverter with Trina Solar panels, Commissioning completed Alhamdulillah.
This is how SPD'S secure our solar project
zhlédnutí 257Před 2 lety
This is how SPD'S secure our solar project
Root Cause analysis of Accident on our Installed site Last VDO where SPD were burnt and blast in it
zhlédnutí 164Před 2 lety
Root Cause analysis of Accident on our Installed site Last VDO where SPD were burnt and blast in it
45kw Solar panels Generated 216kwh power (which was installed 2 years ago Alhamdulillah)
zhlédnutí 159Před 2 lety
45kw Solar panels Generated 216kwh power (which was installed 2 years ago Alhamdulillah)
Maxpower Voltas ki performance kesi hai? Nitrox ky muqabla men
Excellent work
Assalamualaikum,
Koi contect Email address Apse Contect Kese Karain ... Mene RO Plant Solar Pr Convert Karna He Ke Se (Karachi)
,سر جی کیا آپ مجھے بتا سکتے ہیں کہ میں ،spd کی ارتھ نوٹل سے کر سکتا ہوں
Inverex Veyron2 4 kWh pr 61 error araha hai
Plz rabta number
How to remove parallel settings?
How to update?
بہت اچھا کام کیا ھے آپ نے ۔۔۔اگر کاپر راڈ کے بعد کاپر وائر پر پی وی سی پائپ چڑھا لیا جائے تو کاپر وائر زیادہ محفوظ نہیں ھو جائے گی Oxidized ھونے سے؟؟؟؟
اور کیا میں اپنے میکس پاور اٹھ کلوُواٹ کو 10 10 کی سٹرینگ بنا کر ان کر سکتے ہیں
اسلام علیکم میرا ایک سوال ہے سر اپ نے 20 پینل سٹرینگ کیسے بنائی ہے مطلب انورٹر کو 10 10 کی سٹرینگ بنائی ہے یا 4 سٹرینگ 5 5 کی
Walikum assalam 5 solar panels ki 4 strings bana k di inverter ko
❤
Error 12
Apka contact number?
Apka contact number?
Apka number?
03453540734
Himel SPD k agr cartridges lene hon?
@@haroonrasheedvirk141 Nahi brother koi BHI separately sell Nahi karaha hai, pori spd hi lekar lagani party hai
@@HibaTradingSMCPVTLtd Himel SPD ki kya price hai?
City?
@@HibaTradingSMCPVTLtd Toba Tek Singh
SPD ki sides py 2 breaker kis cheez k hain?
❤❤❤❤❤❤❤
Ye spd connection ap ne breaker k out per lagaye thy ya in per
Input per
I purchased this battery in march 22. It is completely discharged and is not picking up charging. How can I rectify its trouble?
AoA. Boss Inverex 3.2KW without batteries, jese hi wapda off hoti hay to continue alarm ke sath error f51 ata hay. Disconnect Kar ke sirf wapda ya wapda+solar pe Karen to thheek ho jata hay. Aur no load pe bhi 1.5-1.7A wapda istamal karta hay.
20 kilo watt lod के लिए कौन सा earthing कराना चाहिए
O bhaiya aap apna number send karo meherbani karo sabke number mis Ho Gaye Hain Meri mobile se aap raste Mein aao Jara jaldi karo
03113360019
Humble Bhai kya hal hai
10 code ka error araha he bata sakty ho kia masla hoga
sir less then 1 ohm resistance ki earthing price kia ho gi? solar ky liye krwani hai 6kw
Bhai ap ka number?
03453540734
Asalam-o-Alaikum Dear Sir, We are delighted to announce the official launch of our product, the "Earth Conductivity Enhancing Compound" (ECEC). This cutting-edge solution is a proprietary blend of Bentonite-based compounds meticulously engineered to exhibit exceptional conductivity, moisture absorption capabilities, and lower the resistance to soil-related challenges. Key Features: BENTONITE (ECEC).pdf CFET & CBER Flyer.pdf ·Maintenance free ·Highly conductive ·Suitable for all types of soil ·Moisture independent ·Non corrosive ·Highly hygroscopic ·Environment friendly ·Soil resistance reducing agent Compliance: ECEC adheres to International Standards, proudly conforming to IEEE, IEC, and BS Codes, guaranteeing the highest quality and reliability in its performance. Quality Assurance: We are proud to share that ECEC has undergone rigorous Testing at PCSIR Labs, further validating its efficacy and compliance with industry standards. ECEC excels in quality compared to imported alternatives and offers a significant cost advantage when compared to local market options. This innovative product is poised to revolutionize the landscape of grounding solutions, providing our clients with a reliable and sustainable option for their electrical infrastructure projects. For more information or inquiries, please feel free to reach out at : crosslinkers.engr@gmail.com or WhatsApp 03002685891
Asalam alikum Bahi Ap ka kam bout zabardast hota hai Ap achy se edit kar k full work ki video load karn ap k bout zayada views hoon Abbottabad se Syed Tehseen Shah
Walikum assalam Brother editing nahi ati mujhey isliye Bina edit upload kardeta hun
@@HibaTradingSMCPVTLtdap kise se rabta karo kise se apni full video edit karwa lo ya boy rahko ehs kam k leye
Kya lighting arrestor ka connection plates se hoty huye earth tk kia ja skta hai? Matlab arrester to door laga hua hai lekin pehle plates k sath wire se connect kia hau hai! Phir dosri side ki plate se wire connect krky earth di v hai! Kya ye sai hai?
Nahi brother lightning arrestor k liye separate earth hoga
اس ارتھنگ کیلئے کتنا فٹ بور کیا گیا جو مشین استعمال کرنی پڑی۔ اور کتنے کلوواٹس کا پروجیکٹ ھے؟
60ft depth. 24kw project
you need to check the resistance of the earthing as well to work. It should be less than 3 ohms. we provide best ESE Lightning Protection System just search on google Alfakinetiks
❤❤❤❤❤❤
MASHALLAH
Great work
It is mandatory to install 3 separate earthings for AC, DC and Lightning Arrestor
Yes it is mandatory
Are you recommend for installation of earthing and lightning arrestor for 3.5 KW solar system?
No. Only 1 will be enough for that small system.
Nitrox 6 kw ke price ?
385k
Sir falt 12 ka keya selushin hy
03453540734
Assalamualaikum sir ap is number par rabtta kar la sir ma rf electronics Multan sa bat kar rha hu
Rate kia he for karachi
55k except boring cost
Batt tou 100ah hai
Brother 200ah hai ye
Battery price
0.85m
@@HibaTradingSMCPVTLtd smaj nae ai bro
They have done a perfect earthing and used perfect materials for earthing.
Earthing par kharcha kitna ata hai
Sir it depends on hardware, the hardware chosen in above VDO would've cost around 130k each
Good work bhai❤ From Zafar Ahmed
Price with delivery charges at khanqah dogran. district sheikhupura punjab.
Brother price of what? Distribution box ??
@@HibaTradingSMCPVTLtd Price of complete 3 kw solar set without batteries along with delivery charges.
@@anwardogar2836 03453540734-whatsapp
Nmbar send kro bhi ❤❤
03453540734
Yeh plant 5000 galon sat bara lag raha hai load bata sakty hain please