- 69
- 112 917
Kyle Zhang
Registrace 22. 03. 2016
Hi there ! Welcome to my channel ! Most of my videos is about solar inverter and its accessories. I have been in this field for 6 years as an engineer.
Deye 10KW High Voltage Hybrid inverter and Deye GBL Battery installation Video
Deye 10KW High Voltage Hybrid inverter and Deye GBL Battery installation Video
zhlédnutí: 597
Video
Deye 50KW Hybrid Inverter Introduction
zhlédnutí 276Před 6 měsíci
Deye 50KW Hybrid Inverter Introduction
Deye String Inverter and meter installation video(70 110kW)
zhlédnutí 165Před 6 měsíci
Deye String Inverter and meter installation video(70 110kW)
Deye 136KW String Inverter Introduction EN
zhlédnutí 186Před 6 měsíci
Deye 136KW String Inverter Introduction EN
How to configure the external relay box with Deye Microinverter
zhlédnutí 972Před 11 měsíci
It tells how to configure the external relay box with Deye Microinverter
Deye Three Phase Hybrid Inverter 100% Unbalanced Output Application
zhlédnutí 245Před 11 měsíci
It tells the Deye 3phase hybrid inverter can give unbalanced output according to the load power.
Deye String Inverter Diesel Generator Solutions
zhlédnutí 1,1KPřed 11 měsíci
It tells how to use 1pcs meter to realize zero export function for several units Deye string inverters. Also it tells how to use the Deye string inverter with the diesel generator.
Deye 10KW High Voltage Hybrid Inverter with BYD HVS Battery Installation Video
zhlédnutí 791Před 11 měsíci
It tells how to install Deye 10KW High Voltage Hybrid Inverter with BYD HVS Battery
How to disassemble Deye 5KW Hybrid Inverter
zhlédnutí 596Před 11 měsíci
It tells how open the cover and take out the PCB of the Deye 5KW Hybrid inverter
How to Assembly the PCB for Deye 5KW Hybrid Inverter
zhlédnutí 2,3KPřed 11 měsíci
How to Assembly the PCB for Deye 5KW Hybrid Inverter
Deye 5KW Single Phase Hybrid Inverter Installation Video
zhlédnutí 487Před 11 měsíci
It tells how to install Deye 5KW single phase hybrid inverter.
Deye 16KW Hybrid Inverter Introduction
zhlédnutí 351Před rokem
Deye Single Phase 16KW Hybrid Inverter Introduction
Deye 16kW Single Phase Hybrid Inverter Introduction
zhlédnutí 585Před rokem
Deye 16kW Single Phase Hybrid Inverter Introduction
How to Connect the Eastron Meter to Deye Hybrid Inverter
zhlédnutí 2,5KPřed 2 lety
How to Connect the Eastron Meter to Deye Hybrid Inverter
Deye 8KW Single Phase Hybrid Inverter Installation Video
zhlédnutí 22KPřed 2 lety
Deye 8KW Single Phase Hybrid Inverter Installation Video
How to disassemble Deye 3phase 10KW on-grid inverter Part I
zhlédnutí 1,2KPřed 3 lety
How to disassemble Deye 3phase 10KW on-grid inverter Part I
Deye Hybrid Inverter Max 16pcs in Parallel
zhlédnutí 7KPřed 3 lety
Deye Hybrid Inverter Max 16pcs in Parallel
How to setup parameters for Deye string inverter on the Solarman new platform
zhlédnutí 304Před 3 lety
How to setup parameters for Deye string inverter on the Solarman new platform
Deye Residential Hybrid Inverter Introduction
zhlédnutí 837Před 3 lety
Deye Residential Hybrid Inverter Introduction
Deye Hybrid Inverter Diesel Generator Application
zhlédnutí 256Před 3 lety
Deye Hybrid Inverter Diesel Generator Application
Deye Hybrid Inverter Peak Shaving Application
zhlédnutí 4,4KPřed 3 lety
Deye Hybrid Inverter Peak Shaving Application
Deye Hybrid Inverter Quick Setup Guide Video
zhlédnutí 19KPřed 3 lety
Deye Hybrid Inverter Quick Setup Guide Video
Deye Hybrid Inverter Smart Load Application Introduction
zhlédnutí 1,5KPřed 3 lety
Deye Hybrid Inverter Smart Load Application Introduction
Visit Deye booth at 14th SNEC PV Power Expo
zhlédnutí 52Před 3 lety
Visit Deye booth at 14th SNEC PV Power Expo
Hello. Certainly! I am experiencing a problem with my Deye 50 kW inverter. When the inverter is taking all its load from solar power and my batteries are at 100% charge, the grid consumption is displayed as 0.014 kW. However, when I measure the current on the grid cable with an ammeter, it shows a consumption of 14 amps on each line. Despite this, the inverter's screen indicates no power consumption from the grid. Can you please help me resolve this issue?⸻Let me know if you need any further adjustments or additional details included!
Can I parallel a 5kw and an 8kw inverter from the same brand (Deye)?
If using Eastron meter what will happen if the grid went down?
Seems there's a problem with this feature. When the battery SOC is 100%, the PV input Watt will be close to 0 - so smart load never triggers. Setting smart load trigger ON before 100% won't work in all circumstances, because battery SOC can approach 100% in parallell with smart load operation. A deadlock scenario basically. Any workaround for this?
Sono molto interessato a l'acquisto sia del Inverter 10KW che pacco batterie ma vorrei sapere il costo e se è disponibile a Milano.
Sorry how i turn on the ac circuit breaker of microinverter? I connected everything and i connected to the relay web and i did the quick set. But nothing power coming from the microinverter to the grid.
Can work in parallel Hybrid invertor and on-grid Invertor (once without battery)?
When will those be available please?
Fajny film, dziękuję.
Hy y 6
Hey Kyle, thanks for your videos! I have been some troubles with communication between string inverters and SMD630CT, it doesnt give any error in inverter just assume it is zero if I turn on "Meter" in parameters and doesnt give any information before that. Sometimes it work smoothly others times happens it, you have any tip? thanks you
what does "IT system neutral is not grounded" option do?
If your grounding system is IT, which PE and N are separated, check this box.
Just a lot of music and no explanations. Can you not speak?👎
how can buy
Sir, where can I find more information? Will it help on a 8kW 1 phase inverter with 6 panels in the sun and 6 panels partly shaded. Panel Voc 37,3V and Vmpt 30,5?
hello, I installed a sun-8K-SG01LP1-US/EU hybrid Deye inverter, on which I mounted a 10kw battery with bms jk, during the day when I disconnect the electrical network it is ok, but at night when the panels no longer I produce and disconnect the network, the battery enters the load after 3 minutes, can it be set to enter the load immediately??? (I mention that in the manual it is written that it can also work with agm, gel battery, i.e. not with a dedicated battery) the inverter detects the battery but on application is not visible, what settings can be made or can be made ???? anticipated thanks for the answer.
Could please send me the complete settings video... I have installed a inverter but when tested load neutral line showing tester glowing, however phase line L) not glowing tester..but voltage showing 230v
on-grid or off-status?
Nice job! May I know about the transformer techonology? I Mean; I can not see transformer there, Regards!
it is on the back of heatsink
How can you export data to a PC can you show me please. Thanks
Hello My name is Ivan. I am from Bulgaria. I bought SUN-10K-SG04LP3-EU With serial number 2303026682. After one mistake (turned on with big voltage) we burned the condenzator . We replace it but still. Have the problem to start work properly. Please it is possible to send me the documents on main bord scheme(service documents) not users menu. Please we tray to find a service near to ours contry but we couldn't. I will be very happy if helps me! Create thanks!
promo sm
good convertr i have the 8KW version i only wich the display hade a better contrast is verry poor, anny one a solution?
What an Chinatrash
Hello Kyle Zhang. Do you have a business address in China for me to buy the MECD. He is fantastic and I would like to acquire at least one. I need an email or a business website. It's possible? I await your information. Tks Valmont
kyle.zhang@deye.com.cn
thank you, how to connect to LAN network not WIFI?
if so, need to use the datalogger with LAN port
Great accent 👌
Hello thank you for the video! Is it necessary to plug the load ports ?
not mandatory. if grid stable, then you also can connect the all the "load" at the grid side and choose zero export to CT
hello can you kontakt me !
what does the "ARC fault" option do in the settings of the 3phase Deye 12kw?
it means the inverter sense there's PV arc occur, then give this code.
how to connect 1 or 2 microinverters, to a 3phase Deye 12kw GENport?
you can try to connect the first one on the L1 and N of the GEN port. the second one on the L2 and N port of GEN. or you can connect them in series and then connect them at the L1 and N of the GEN port
Can I display the smart on my phone screen??
didn't get it
any difference in using the CNHT meter compared to the CT clamps??
The function is same, but the CHNT meter can show other parameters e.g. reactive power, PF/THD.etc.
Excellent inverter hybride
Thank you. Very help full video.
Deye, why your CT pointing toward grid?? In my manual it say pointinig toward inverter to utilize zero export to grid? Please advise Thnx
arrow towards inverter
Hi Kyle, I configured the Deye inverter for off grid setup and connected all my loads directly to the inverter. No export to grid or to home load. But I still have power flowing in the grid. How can I zero out this power to the grid (I have sufficient power from Panel and Battery)?
Check out the direction of your current transformer (CT)
Hello, what are the benefits of an energy meter?
The meter can show other parameters e.g. reactive power, PF/THD.etc. besides the grid power.
Hello Kyle, I can’t connect to wifi_test 😢
please contact service@deye.com.cn
What does CT stand for?
Current transformer
what the range you set foe the herts
Thanks. Do you have a video to dis-assemble the PCB as well?
czcams.com/video/vWtyuANk1Rw/video.html
Thanks for sharing your experience.
Hello in other videos we see the CT with the arrow which is turned towards the inverter and it says to you towards the network it is contradictory. can you confirm the direction I do not want to resell thank you
arrow towards inverter
Hi Kyle. Imagine the following situation: the installer changes the wifi AP password from 12345678 to any other and forgets this new password. Do you know if it is possible to reset wifi AP password to the default password (12345678)?
yes, it is possiable, it needs a professional APP, please connect service@deye.com.cn
Amazing video! One question: I have a small battery bank. Is there a way of setting it up to use just as a no-break? Not draining from battery unless PV is insufficient and grid is out? I assume it would be Zero export to Load, Load First, grid charge. Am I right? Thanks for the work
if using very small size battery, it may damage the battery.
Work without even one word.
Hello Kyle. I have a SUN1600G3-EU-230 microinverter connected to router using WIFI and I can monitor the solar production in solarman. My question is: how can I monitor the power consumption of my home? I have been told to use an MECD. Is it also compatible with a smart meter to measure the compsumption of the home?
if so, need to use the energy meter of solarman and the meter need to be installed at the grid side.
good day, i have 2pcs deye hybrid inverter connected in parallel can i also connect their smartload ports in parallel???
Hi can
hello, is there any way of locking my screen using a password? so that no one can change my settings ?
there's password to lock the parameters setting. four 9
hi thanks for the detailed video , just got Deye hybrid, its an amazing inverter. I have 200 amp c20 batteries can i do time schedule with these batteries in the system work mode?
HI yes can
Je naweza kuto kutiki Grid charge ili kuondoa gharama ya umeme wa Grid kuchaji battery zangu?. Ninachotaka nikuona panakuwa na Grid passthroug to the load.