Class20fan
Class20fan
  • 48
  • 49 931
Trains at Peterborough 25/05/24
A mix of fright and anger assented trains at Peterborough station
zhlédnutí: 214

Video

Locomotive legends at the Nene valley railway
zhlédnutí 629Před měsícem
Stock list: 55013: The black watch 45041: Royal tank regiment 9529: class 14 34111: Royal auxiliary air force
Trains on the Isle of Wight 10/4/24
zhlédnutí 496Před 2 měsíci
Trains on the Isle of Wight 10/4/24
Trains at Alexandra palace 16/03/24
zhlédnutí 434Před 3 měsíci
Trains at Alexandra palace 16/03/24
The great central railway 14/02/24
zhlédnutí 80Před 4 měsíci
The great central railway 14/02/24
14/01/24 Trains on the spa valley railway.
zhlédnutí 359Před 5 měsíci
14/01/24 Trains on the spa valley railway.
30/12/23 Trains in south London.
zhlédnutí 2,1KPřed 6 měsíci
30/12/23 Trains in south London.
Trains at Milton Keynes station.
zhlédnutí 448Před 8 měsíci
Trains at Milton Keynes station.
The great electric train show 2023
zhlédnutí 79Před 8 měsíci
On the 14th of October 2023 at Milton Keynes
Epping and Ongar diesel gala 2023
zhlédnutí 630Před 9 měsíci
Epping and Ongar diesel gala 2023
Trains at wadhurst
zhlédnutí 3KPřed 10 měsíci
Trains at wadhurst
Volks electric railway at Brighton
zhlédnutí 100Před 10 měsíci
Volks electric railway at Brighton
A day out on the spa valley
zhlédnutí 204Před 11 měsíci
A day out on the spa valley
257 squadron heading to tunbridge wells west.
zhlédnutí 31Před rokem
257 squadron heading to tunbridge wells west.
2890 arriving at tunbridge wells west
zhlédnutí 312Před rokem
2890 arriving at tunbridge wells west
Southern 377s arriving at Gatwick airport
zhlédnutí 298Před rokem
Southern 377s arriving at Gatwick airport
700004 700044 at London Blackfriars.
zhlédnutí 2,8KPřed rokem
700004 700044 at London Blackfriars.
A pair of 375s arriving into tunbridge wells station
zhlédnutí 185Před rokem
A pair of 375s arriving into tunbridge wells station
Some 375s going fast through robertsbridge station.
zhlédnutí 117Před rokem
Some 375s going fast through robertsbridge station.
Trains on the spa valley railway.
zhlédnutí 42Před rokem
Trains on the spa valley railway.
700027 departing London Blackfriars .
zhlédnutí 1,7KPřed rokem
700027 departing London Blackfriars .
377607 leaving East Croydon station.
zhlédnutí 565Před rokem
377607 leaving East Croydon station.
Some 700s at Blackfriars station.
zhlédnutí 26KPřed rokem
Some 700s at Blackfriars station.
37227 leaving Princess Risborough to run round it’s train.
zhlédnutí 39Před rokem
37227 leaving Princess Risborough to run round it’s train.
257 squadron on its way to Eridge.
zhlédnutí 79Před rokem
257 squadron on its way to Eridge.
Class 207 heading to Eridge.
zhlédnutí 49Před rokem
Class 207 heading to Eridge.
D7612 hauling a short train to tunbridge wells west.
zhlédnutí 121Před rokem
D7612 hauling a short train to tunbridge wells west.
33063+track tamper and ballast regulator.
zhlédnutí 98Před rokem
33063 track tamper and ballast regulator.
31430 (Sister Dora) on the spa valley railway.
zhlédnutí 38Před rokem
31430 (Sister Dora) on the spa valley railway.
Track tamper BR 73434 on the spa valley railway
zhlédnutí 55Před rokem
Track tamper BR 73434 on the spa valley railway

Komentáře

  • @stevenh7648
    @stevenh7648 Před 3 dny

    Great view from the brake van!

  • @FastlineFilms
    @FastlineFilms Před 2 měsíci

    Nice video! Your 100th subscriber!

  • @Farleigh1050
    @Farleigh1050 Před 6 měsíci

    0:42 I HAVE BEEN UN-NETWORKERED

  • @stevenh7648
    @stevenh7648 Před 8 měsíci

    Top video!

  • @emmahatch1728
    @emmahatch1728 Před 9 měsíci

    great vid broski

  • @user-fb9ie7vy6s
    @user-fb9ie7vy6s Před rokem

    what a wonderful sight to see!

  • @Sheffield5047
    @Sheffield5047 Před rokem

    For Watford? Or London Bridge via Norbury?

    • @Class20fan
      @Class20fan Před rokem

      It was going towards London Bridge via Norbury.

  • @Julie-ye8uh
    @Julie-ye8uh Před rokem

    Great video.

  • @LondonTransport466
    @LondonTransport466 Před rokem

    Nice catch! 😊

  • @cannadineboxill-harris2983

    I needed to know why they don’t dig a tunnel and do an extension for the main line Train so that they can extend the unused abandoned underground train stations. Why couldn’t they use the part D78 Stock train doors on the sides and also restructure the front face of the A60 and A62 stock and that includes the class 313, class 314 and class 315 remix and make them all together and also redesign them an overhead line and also make them into Five cars per units and also having three Disabled Toilets on those Five cars per units A60 and A62 stock trains and also convert the A60 and A62 stock trains into a Scania N112, Volvo B10M, Gardner 6LXB, Gardner 6LXC and Gardner 8LXB Diesel Engines and also put the Loud 7-Speed Voith Gearboxes even Loud 8-Speed Leyland Hydra cyclic Gearboxes in the A60 and A62 stock, class 313, class 314, and class 315 and also modernise the A60 and A62 stock and make it into an 11 car per unit so it could have fewer doors, more tables, computers and mobile phone chargers. A Stock Trains and also having 8 Disabled Toilets on those A stock trains. why couldn’t we refurbish and modernise the Waterloo and city line Triple-Track train tunnel and make it more Larger and extend it to the bank station, making it into a Triple-Track Railway Line so those Five countries such as Australia, Germany, Italy, Poland And Sweden to convert the waterloo and city line Triple-Track Railway tunnel into a High-Speed Railway lines? The Third Euro tunnel Triple-Track Railway line to make it 11 times better for passengers so they could go from A to B. Then put the modernised 11 car per unit A Stock and put them on a bigger modernised Waterloo and city line Triple-Track train tunnel so it could go to bank station to those Five countries such as Australia, Germany, Italy, Poland And Sweden. The modernised refurbished 11 cars per unit A stock could be a High Speed The Third Triple-Track Euro Tunnel Train So it is promising and 47 times a lot more possible to do this kind of project if that will be OK for London Australia, Germany, Italy, Poland And Sweden. oh by the way, could they also tunnel the Triple-Track Railway Line so it will stop from Buckinghamshire, Hertfordshire and Essex so that the Passengers will go to Australia, Germany, Italy, Poland and Sweden and also extend the Triple-Track Railway Line from the Bank to Buckinghamshire, Hertfordshire and Essex Stations so that more people from there could go to Australia, Germany, Italy, Poland And Sweden more Easily. Why couldn't they extend the Piccadilly line and also build a brand-new underground train station so it could go even further right up to Clapton, Wood Street can they also make another brand new underground train stations in Chingford and could they extend the Piccadilly Line and the DLR right up to Chingford? All of the classes 150, 155, 154, 117, 114, 105, and 106, will be replaced by all of the Scania N112, Volvo B10M, Gardner 6LXB, Gardner 6LXC and Gardner 8LXB Diesel Five carriages three disabled toilets are air conditioning trains including Highams Park for extended roots which is the Piccadilly line and the DLR trains. Could you also convert all of the 1973 stock trains into an air-conditioned maximum speed 78 km/hours (48 MPH) re-refurbished and make it into a 8 cars per unit if that will be alright, and also extend all of the Piccadilly train stations to make more space for all of the extended 8 car per unit 1973 stock air condition trains and can you also build another Mayflower and Tornado Steam Locomotive Companies and can they order Every 37 Octagon and Every 17 Hexagon shape LNER diagram unique small no.13 and unique small no.11 Boilers from those Countries such as Greece, Italy, Poland, and Sweden, can they make Mayflower and Tornado Steam Locomotive speeds by up to 142MPH so you can try and test it on the Original Mainline so it will be much more safer for the Passengers to enjoy the 142MPH speed Limit only for HS2 and Channel Tunnel mainline services, if they needed 16 Carriages Per units, can they use those class 55’s, class 44’s, class 40’s and class 43HST Diesel Locomotive’s right at the Back of those 18 Carriages Per Units so they can take over at the Back to let those Mayflower and Tornado Steam Locomotive’s have a rest for those interesting Journeys Please!!!!!, oh can you make all of those Coal Boxes’s 17 Tonnes for all of those 142MPH Mayflower and Tornado Steam Locomotive’s so the Companies will Understand us PASSENGER’S!! so please make sure that the Builders can do as they are told!!!!! And please do something about these very very important Professional ideas Please? Prime Minister of England, Prime Minister of Australia, Prime Minister of Sweden, Prime Minister of Germany, Prime Minister of Italy, Prime Minister of Poland and that Includes the Mayor of London.

  • @cannadineboxill-harris2983

    I needed to know why they don’t dig a tunnel and do an extension for the main line Train so that they can extend the unused abandoned underground train stations. Why couldn’t they use the part D78 Stock train doors on the sides and also restructure the front face of the A60 and A62 stock and that includes the class 313, class 314 and class 315 remix and make them all together and also redesign them an overhead line and also make them into Five cars per units and also having three Disabled Toilets on those Five cars per units A60 and A62 stock trains and also convert the A60 and A62 stock trains into a Scania N112, Volvo B10M, Gardner 6LXB, Gardner 6LXC and Gardner 8LXB Diesel Engines and also put the Loud 7-Speed Voith Gearboxes even Loud 8-Speed Leyland Hydra cyclic Gearboxes in the A60 and A62 stock, class 313, class 314, and class 315 and also modernise the A60 and A62 stock and make it into an 11 car per unit so it could have fewer doors, more tables, computers and mobile phone chargers. A Stock Trains and also having 8 Disabled Toilets on those A stock trains. why couldn’t we refurbish and modernise the Waterloo and city line Triple-Track train tunnel and make it more Larger and extend it to the bank station, making it into a Triple-Track Railway Line so those Five countries such as Australia, Germany, Italy, Poland And Sweden to convert the waterloo and city line Triple-Track Railway tunnel into a High-Speed Railway lines? The Third Euro tunnel Triple-Track Railway line to make it 11 times better for passengers so they could go from A to B. Then put the modernised 11 car per unit A Stock and put them on a bigger modernised Waterloo and city line Triple-Track train tunnel so it could go to bank station to those Five countries such as Australia, Germany, Italy, Poland And Sweden. The modernised refurbished 11 cars per unit A stock could be a High Speed The Third Triple-Track Euro Tunnel Train So it is promising and 47 times a lot more possible to do this kind of project if that will be OK for London Australia, Germany, Italy, Poland And Sweden. oh by the way, could they also tunnel the Triple-Track Railway Line so it will stop from Buckinghamshire, Hertfordshire and Essex so that the Passengers will go to Australia, Germany, Italy, Poland and Sweden and also extend the Triple-Track Railway Line from the Bank to Buckinghamshire, Hertfordshire and Essex Stations so that more people from there could go to Australia, Germany, Italy, Poland And Sweden more Easily. Why couldn't they extend the Piccadilly line and also build a brand-new underground train station so it could go even further right up to Clapton, Wood Street can they also make another brand new underground train station in Chingford and could they extend the Piccadilly Line and the DLR right up to Chingford? All of the classes 150, 155, 154, 117, 114, 105, and 106, will be replaced by all of the Scania N112, Volvo B10M, Gardner 6LXB, Gardner 6LXC and Gardner 8LXB Diesel Five carriages three disabled toilets are air conditioning trains including Highams Park for extended roots which is the Piccadilly line and the DLR trains. Could you also convert all of the 1973 stock trains into an air-conditioned maximum speed 78 km/hours (48 MPH) re-refurbished and make it into a 8 cars per unit if that will be alright, and also extend all of the Piccadilly train stations to make more space for all of the extended 8 car per unit 1973 stock air condition trains and can you also build another Mayflower and Tornado Steam Locomotive Companies and can they order Every 37 Octagon and Every 17 Hexagon shape LNER diagram unique small no.13 and unique small no.11 Boilers from those Countries such as Greece, Italy, Poland, and Sweden, can they make Mayflower and Tornado Steam Locomotive speeds by up to 142MPH so you can try and test it on the Original Mainline so it will be much more safer for the Passengers to enjoy the 142MPH speed Limit only for HS2 and Channel Tunnel mainline services, if they needed 16 Carriages Per units, can they use those class 55’s, class 44’s, class 40’s and class 43HST Diesel Locomotive’s right at the Back of those 18 Carriages Per Units so they can take over at the Back to let those Mayflower and Tornado Steam Locomotive’s have a rest for those interesting Journeys Please!!!!!, oh can you make all of those Coal Boxes’s 17 Tonnes for all of those 142MPH Mayflower and Tornado Steam Locomotive’s so the Companies will Understand us PASSENGER’S!! so please make sure that the Builders can do as they are told!!!!! And please do something about these very very important Professional ideas Please? Prime Minister of England, Prime Minister of Australia, Prime Minister of Sweden, Prime Minister of Germany, Prime Minister of Italy, Prime Minister of Poland and that Includes the Mayor of London.

  • @RailJapanStory
    @RailJapanStory Před rokem

    Wonderful video😉👍️✨

  • @emmahatch1728
    @emmahatch1728 Před rokem

    wow so cool

  • @stevenh7648
    @stevenh7648 Před rokem

    Great video

  • @Class20fan
    @Class20fan Před rokem

    Chinnor and princes risborough