Hurontario Line 10 LRT Construction Between South Service Rd and Port Credit Station
August 11 2024
24 666762
We are heading southbound on Hurontario Street and having a look where construction stands for this 18km line from Brampton Steeles Ave and Mississauga Port Credit GO Station. It is known as Hurontario LRT Line 10 as well the Hazel McCallum Line with Brampton being Hurontario/Main Line 10
The road is not widen for the LRT as they are only building the new southbound lane and have yet to start on the northbound lane. Lots of poles to be remove for both directions including the area that was partly built. Guideway being built across Mineola Intersection.
The old Inglewood intersection and bridge removed and moved to the new location that just open last month.
The LRT will move from the centre to the right side that will connect to the guideway already in place and will enter the Port Credit Station under the new rail underpass.
The construction of the line was started in the fall of 2020 and to enter service in September 2024 as a P3 contract that was pushed back to the end of 2020 at the start of construction. It is unknown when this line will see service now as it is so late, but late 2026 is the most likely date now based on what I have seen first hand for the corridor.
Now that the Province has added the extension for Mississauga City Core Loop to the plan, it will have no effect at this time for opening the line in 2026. With the loop back in the picture, the line will be split into 2 lines forcing riders to travel an extra 15 minute as well transferring tine that it defeat the idea of getting people out of the car to get to the Cooksville GO station and the Dundas BRT Line.
The extension to Brampton GO Station that will add another km to the line that will not effect the opening of the line if the plan Steeles south station is not relocated to the north side off Steeles before construction starts on it in 2025. The rest of the extension is yet to be determined if it will be built on the surface in Brampton Downtown or to be tunnel.
At this time, Brampton plan on tearing the heritage section of the downtown down as well remove the underground creek tunnel. Brampton want to reduced the 4 lane road to 2 lanes with wider sidewalk and cycling lane. To built the tunnel for the LRT will cost an extra $2 Billion dollars and could be 2030 plus before service can start and close to 3+ years after the surface line is in service.
The Province has approved the 2 extension, but has yet to release funds and call for amendments made to the current EA's, let along call for bidding on them.
zhlédnutí: 48

Video

Hurontario Line 10 LRT Construction Between King Street and South Service Rd
zhlédnutí 67Před 28 dny
August 11 2024 24 666761 We are heading southbound on Hurontario Street Between King Street and South Service Rd having a look where construction stands for this 18km line from Brampton Steeles Ave and Mississauga Port Credit GO Station. It is known as Hurontario LRT Line 10 as well the Hazel McCallum Line with Brampton being Hurontario/Main Line 10. At the Queensway Intersection stop, it still...
A View Of The Construction Of The Mississauga Hurontario LRT Line !0 Derry Rd to OMSF
zhlédnutí 197Před měsícem
July 21/24 24-665198 We head northbound on Mississauga Hurontario Street from Derry Rd to OMSF to see where construction stands for building The Metrolinx Hurontario LRT 10 AKA Hazel McCallion Line running from Brampton Steeles Ave to Mississauga Port Credit GO Station for 19km. We will pass the first station shelter that went up in Dec of 2023 and still not completed fully yet. The guideway is...
A View Of The Construction Of The Mississauga Hurontario LRT Line !0 Ambassador To Derry Rd
zhlédnutí 156Před měsícem
July 21/24 24-665197 We head northbound on Mississauga Hurontario Street from Ambassador To Derry Rd see where construction stands for building The Metrolinx Hurontario LRT 10 AKA Hazel McCallion Line running from Brampton Steeles Ave to Mississauga Port Credit GO Station for 19km. Guideway built, but not track pour in place with OS poles up The LRT line was schedule to open in September 2024 t...
A View Of The Construction Of The Hurontario LRT Line !0 Courtneypark to Ambassador
zhlédnutí 86Před měsícem
July 21/24 24-665196 We head northbound on Mississauga Hurontario Street from Courtneypark to Ambassador to see where construction stands for building The Metrolinx Hurontario LRT 10 AKA Hazel McCallion Line running from Brampton Steeles Ave to Mississauga Port Credit GO Station for 19km. Guideway built, but not track pour in place with OS poles up The LRT line was schedule to open in September...
A View Of The Construction Of The Hurontario LRT Line !0 Hwy 401 To Courtneypark
zhlédnutí 100Před měsícem
July 21/24 24-665195 We head northbound on Mississauga Hurontario Street from Hwy 401 To Courtneypark to see where construction stands for building The Metrolinx Hurontario LRT 10 AKA Hazel McCallion Line running from Brampton Steeles Ave to Mississauga Port Credit GO Station for 19km. Guideway not fully built between the 2 off ramps yet The LRT line was schedule to open in September 2024 that ...
A View Of The Construction Of The Hurontario LRT Line !0 Britannia to Hwy 401 Westbound Off Ramp
zhlédnutí 86Před měsícem
July 21/24 24-665194 We head northbound on Hurontario Street from Britannia to Hwy 401 Westbound Off Ramp to see where construction stands for building The Hurontario LRT 10 AKA Hazel McCallion Line running from Brampton Steeles Ave to Port Credit GO Station for 19km. Guideway not fully built between the 2 off ramps yet for Hwy 401 The LRT line was schedule to open in September 2024 that was pu...
A View Of The Construction Of The Hurontario LRT Line !0 Eglinton Ave to Barondale
zhlédnutí 76Před měsícem
July 21/24 24-665193 We head northbound on Hurontario Street from Eglinton Ave to Barondale to see where construction stands for building The Hurontario LRT 10 AKA Hazel McCallion Line running from Brampton Steeles Ave to Port Credit GO Station for 19km. The LRT line was schedule to open in September 2024 that was pushed back to December 2024 at the being of the construction of the line. It now...
A View Of The Construction Of The Hurontario LRT Line !0 Hwy 403 to Eglinton Ave
zhlédnutí 119Před měsícem
July 20/24 24-665192 We head northbound on Hurontario Street from Hwy 403 to Eglinton Ave to see where construction stands for building The Hurontario LRT 10 AKA Hazel McCallion Line rom Brampton Steeles Ave to Port Credit GO Station for 19km. The Line was schedule to open in September 2024 that was pushed back to December 2024 at the being of the construction of the line. It now looks like it ...
A View Of The Construction Of The Hurontario LRT Line !0 Robert Speck Pkwy To Sq One Dr
zhlédnutí 94Před měsícem
July 20/24 24-665191 We head northbound on Hurontario Street from Robert Speck Pkwy To Sq One Dr to see where construction stands for building The Hurontario LRT 10 AKA Hazel McCallion Line rom Brampton Steeles Ave to Port Credit GO Station for 19km. At Square One Drive, Leaves the centre of the road for the elevated section for the city core. The line was schedule to open in September 2024 tha...
Hurontario LRT Line 10 Southbound lanes over Hwy 407 is finally ready to be open any day now.
zhlédnutí 83Před 2 měsíci
June 24 2024 24 663809 We have a look at the Hurontario LRT Line 10 also refer as the Hazel McCallion Line. The southbound lanes over Hwy 407 that is finally ready to be open any day now to allow traffic to be shifted to it so the northbound lanes can be rebuilt. It only taken a year to add a hew lane for the Hwy 407 on ramp to allow the existing overpass to be widen for the LRT. Same will happ...
Hurontario LRT Line 10 between Britannia Rd and the North side of Hwy 401 Overpass June 24, 2024
zhlédnutí 60Před 2 měsíci
June 24 2024 24 663797 We have a look at the Hurontario LRT Line 10 also refer as the Hazel McCallion Line guideway to see where the construction is at between Britannia Rd and the North side of Hwy 401 Overpass. Trackwork finally taking place on the overpass that is part of the testbed that was to see testing of the new fleet back in February this year with a lot of missing tracks for the test...
Hurontario LRT Line 10 View between Bristol Rd and Britannia Rd June 24/24
zhlédnutí 79Před 2 měsíci
June 24 24 663796 We have a look at the Hurontario LRT Line 10 also refer as the Hazel McCallion Line guideway to see where the construction is at between Bristol Rd and Britannia Rd. Lot of trackwork waiting to be install and concrete pour to anchor the tracks in place. Matheson Station was the first to be built and tracks still not in place for it yet. The crossover area still not finished no...
Hurontario LRT Line 10 Under Construction Southbound From Matheson To Trailwood Dr Passing A Station
zhlédnutí 149Před 2 měsíci
June 09/2025 133A3775a Quality of video not great as the bus was exceeding the speed limit by 20km and only had the ESO 7D Mark II with me which I hate shooting videos with. Trackwork was to be completed early this year for the 18km line with an opening date of September 24, 2024 that was pushed back to the end of the year 2 years ago, but will not open now until 2026. None of the built station...
First View from the New Commissioner Street Bridges and the New Mouth of The Don River
zhlédnutí 244Před 6 měsíci
February 25/24 MVI 0001a First View from the New Commissioner Street Bridges and the new Mouth of The Don River Still Under Construction including a parkland. The New Commissioner Street and Bridges were open to the Public on January 24/24 6 months late than plan. The rest of the river and parkland will not be completed until 2025/26. This is to deal the flooding of existing lands as well devel...
So Much For Transit Priority For Crosstown LRT Line 5 At Pharmacy Intersection
zhlédnutí 700Před 9 měsíci
So Much For Transit Priority For Crosstown LRT Line 5 At Pharmacy Intersection
Metrolinx Bombardier Freedom Outlook Departing Crosstown Line 5 Pharmacy Station Doing Testing.
zhlédnutí 474Před 9 měsíci
Metrolinx Bombardier Freedom Outlook Departing Crosstown Line 5 Pharmacy Station Doing Testing.
TTC Flexity Outlook LRV Eastbound On The New Queensway ROW On Route 501 Resume Service On Oct 31
zhlédnutí 783Před 9 měsíci
TTC Flexity Outlook LRV Eastbound On The New Queensway ROW On Route 501 Resume Service On Oct 31
TTC Flexity Outlook LRV Westbound On The New Queensway ROW On Route 501 Resume Service On Oct 31
zhlédnutí 270Před 9 měsíci
TTC Flexity Outlook LRV Westbound On The New Queensway ROW On Route 501 Resume Service On Oct 31
View Of Finch West Line 6 LRT Nearing Completion To Open In 2024 At Westmore
zhlédnutí 203Před 10 měsíci
View Of Finch West Line 6 LRT Nearing Completion To Open In 2024 At Westmore
Fast View Of Finch West Line 6 LRT Nearing Completion To Open In 2024
zhlédnutí 332Před 10 měsíci
Fast View Of Finch West Line 6 LRT Nearing Completion To Open In 2024
A View Of Finch West Line 6 LRT Nearing Completion To Open In 2024
zhlédnutí 293Před 10 měsíci
A View Of Finch West Line 6 LRT Nearing Completion To Open In 2024
(Fast) The Guideway For the Hurontario LRT (Hazel McCallion Line) Between Hwy 401And Britannia Rd
zhlédnutí 253Před 10 měsíci
(Fast) The Guideway For the Hurontario LRT (Hazel McCallion Line) Between Hwy 401And Britannia Rd
The Guideway For the Hurontario LRT (Hazel McCallion Line) Between Hwy 401And Britannia Rd
zhlédnutí 140Před 10 měsíci
The Guideway For the Hurontario LRT (Hazel McCallion Line) Between Hwy 401And Britannia Rd
Fast Guideway For the Hurontario LRT (Hazel McCallion Line) Between Eglinton Ave And Britannia Rd
zhlédnutí 118Před 10 měsíci
Fast Guideway For the Hurontario LRT (Hazel McCallion Line) Between Eglinton Ave And Britannia Rd
The Guideway For the Hurontario LRT (Hazel McCallion Line) Between Eglinton Ave And Britannia Rd
zhlédnutí 157Před 10 měsíci
The Guideway For the Hurontario LRT (Hazel McCallion Line) Between Eglinton Ave And Britannia Rd
Mississauga Hurontario Street LRT Topflight Intersection LRT Track Work Taking Place #2
zhlédnutí 330Před 10 měsíci
Mississauga Hurontario Street LRT Topflight Intersection LRT Track Work Taking Place #2
Mississauga Hurontario Street LRT Topflight Intersection LRT Track Work Taking Place
zhlédnutí 576Před 10 měsíci
Mississauga Hurontario Street LRT Topflight Intersection LRT Track Work Taking Place
Fast Front Window View Ride On Montreal REM Phase 1 From End To End On Opening Weekend
zhlédnutí 130Před rokem
Fast Front Window View Ride On Montreal REM Phase 1 From End To End On Opening Weekend
Front Window View Ride On Montreal REM Phase 1 From End To End On Opening Weekend
zhlédnutí 187Před rokem
Front Window View Ride On Montreal REM Phase 1 From End To End On Opening Weekend