The Scenario is:
****************
Your project deliverables are ready, and you are working on supporting the transition of these deliverables to the end users. However, you observe that the end users are resistant to this change because they believe it will result in losing revenue. As a project manager, what should you do?
A. Engage with the end users to understand their concerns, provide information on the benefits of the change, and involve them in the transition planning.
B. Escalate the issue to senior management to force the transition through, emphasizing the project's completion.
C. Make a clear entry criterion for transitioning activities, and postpone the transition indefinitely until the end users are ready and fully supportive.
D. Along with some key stakeholders, engage with the end users to understand their concerns, and take support from stakeholders to provide information on the benefits of the change.
----------------------------------------------------
Right Answer and Explanation:
*********************************
Correct Answer : D)
------------------------------------------------------
PMP Exam Content Outline Mapping
----------------------------------------------------------
People:
* Task 9 Collaborate with stakeholders
Business:
* Task 4 Support organizational change
-----------------------
Topics Covered
****************
• Transitioning Planning
• Supporting Change
---------------------------------------------------------------------------------------------
In this video, we dive into handling end user resistance during the transition of project deliverables, a crucial concept for the PMP exam. We'll explore different approaches and identify the best one according to PMP principles.
Key Concepts:
Option A: Engaging with end users to understand concerns, explain the benefits, and involve them in planning. This is a strong candidate but relies heavily on the project manager.
Option B: Escalating the issue to senior management. This is not ideal without a clear indication of necessity.
Option C: Setting entry criteria and postponing transition indefinitely. This might apply in contractual situations but isn't recommended without clear context.
Option D: Engaging with end users and key stakeholders to understand concerns and collaboratively provide information on benefits. This approach ensures broader support and aligns with organizational change management practices.
--------------------------------------
Domain and Task Focus:
--------------------------------------
1) People Domain Task-9: Collaborate with stakeholders for effective change support.
2) Business Domain Task-4: Focus on supporting organizational change, emphasizing the project manager's role in facilitating but not solely driving the change.
Understanding these concepts helps in managing transitions effectively and prepares you for the PMP exam. Remember, collaboration and clear communication with stakeholders are key to navigating resistance and ensuring successful project transitions.
--------------------------------------------------------------------------------------------
Consider following us on LinkedIn and subscribing on CZcams for more content like this.
-----------------------------------------------------------------------------------------------
** PMP Question Bank Playlist
czcams.com/play/PLWcvFkRbuunlxAQ92tIt1kXWOcgoyhTRR.html
**PMP Daily Poll question bank :
www.izenbridge.com/kb/category/pmp-practice-questions/
**PMP Exam Syllabus- Exam Content Outline (ECO) Tutorial:
www.izenbridge.com/kb/category/pmp-exam-content-outline/
**PMP Agile questions bank:
www.izenbridge.com/kb/category/pmp-practice-questions-agile/
**Get PMP Free Practice Test - 2023 :
www.izenbridge.com/free-resources/pmp-free-quiz/
PMP Certification Training link:
-------------------------------------------------
www.izenbridge.com/project-management/pmp-certification-training/
Also, you can email my support team for more questions at : support@izenbridge.com
Connect with us on WhatsApp : wa.me/919958287711
------------------------------------------------------------------------------------------------------
Instagram : izenbridgeofficial
LinkedIn : www.linkedin.com/company/izenbridge-consultancy-private-limited/
Facebook : izenbridge/
#pmpizenbridge #PMPDaily #PMPExamQuestion #PMPExam #ProjectManagement
#pmpcertification
zhlédnutí: 90

Video

PMP Exam Practice Question and Answer -156 : Good Risk Statements
zhlédnutí 202Před 12 hodinami
"PMP Exam Practice Question and Answer -156 : Identifying Poorly Defined Risk Statements in Project Management | PMP Exam Prep, Project Management, PMP Exam" The Scenario is: As a project manager, you are reviewing risk statements to ensure they are clear and well-structured. Which of the following risk statements is NOT a good presentation of risk? A. In the event of a delay from the supplier,...
PMP Exam Practice Question and Answer -155 : How to Find Risk Audit Frequency in Project Management
zhlédnutí 209Před 19 hodinami
"PMP Exam Practice Question and Answer -155 : How to Find Risk Audit Frequency in Project Management | PMP Exam Prep, Project Management, PMP Exam" The Scenario is: You have been assigned to an ongoing project that has several unresolved issues from the risk compliance group's observations. The compliance group plans to conduct a new risk audit next week. You aim to resolve the issues from the ...
PMP Exam Practice Question and Answer -154 : Good User Story
zhlédnutí 156Před dnem
"PMP Exam Practice Question and Answer -154 : Good User Story | PMP Exam Prep, Project Management, PMP Exam" The Scenario is: To evaluate the effectiveness of the user stories for a mobile app designed to support the shopping of cakes and bakery items, consider the following user stories: User Story A: As a regular buyer, I want to reorder my last order so that I can place the order faster. Use...
PMP Exam Practice Question and Answer -153 : Information to craft release plan
zhlédnutí 179Před dnem
"PMP Exam Practice Question and Answer -153 : Information to craft release plan | PMP Exam Prep, Project Management, PMP Exam" The Scenario is: You are developing a release plan for a software project operating under an adaptive lifecycle. Which set of information is most crucial for effectively crafting this release plan? A) Product Backlog, release goal, and estimated team velocity B) Product...
PMP Exam Practice Question and Answer -152 : Scheduling releases for marketing events
zhlédnutí 152Před 14 dny
"PMP Exam Practice Question and Answer -152 : Scheduling releases for marketing events | PMP Exam Prep, Project Management, PMP Exam" The Scenario is As the project manager for a new mobile app, stakeholders are concerned about aligning feature releases with marketing campaigns. Which artifact would you use to address concerns about scheduling feature releases to align with specific marketing e...
PMP Exam Practice Question and Answer -151 : Communicating Strategic Direction
zhlédnutí 270Před 14 dny
"PMP Exam Practice Question and Answer -151 : Communicating Strategic Direction | PMP Exam Prep, Project Management, PMP Exam" The Scenario is As the project manager of a software development initiative, you are tasked with developing a new online payment system. This project is integral to a larger program aimed at developing e-commerce product, designed to boost the e-commerce capabilities of...
How to question effectively as a coach or leader By Karen Borain
zhlédnutí 96Před 21 dnem
Effective questioning is a cornerstone skill for coaches and leaders, enabling them to guide individuals or teams towards insight, solutions, and growth. By mastering the art of effective questioning, coaches and leaders can facilitate meaningful conversations, foster learning and growth, and empower individuals and teams to reach their full potential.
PMP Exam Practice Question and Answer -150 : Important Elements of Upcoming Sprint User Stories
zhlédnutí 241Před 21 dnem
"PMP Exam Practice Question and Answer -150 : Important Elements of Upcoming Sprint User Stories | PMP Exam Prep, Project Management, PMP Exam" The Scenario is As a new Agile team member tasked with writing user stories for an upcoming sprint, which of the following elements is most important to include to ensure the user stories are effective? A) Acceptance Criteria, detailed technical specifi...
PMP Exam Practice Question and Answer -149 : Stakeholder Requests Significant Changes
zhlédnutí 461Před 21 dnem
"PMP Exam Practice Question and Answer -149 : Stakeholder Requests Significant Changes | PMP Exam Prep, Project Management, PMP Exam" The Scenario is In an Agile environment, your team is midway through a sprint working on several features for a new software product when a key stakeholder requests significant changes to one of the features, based on new customer feedback. What is the most appro...
PMP Exam Practice Question and Answer -148 : Daily Stand-up Meetings Exceeds 15-minute limit.
zhlédnutí 851Před 28 dny
PMP Exam Practice Question and Answer -148 : Daily Stand-up Meetings Exceeds 15-minute limit.
PMP Exam Practice Question and Answer -147 : Dissatisfaction With The Delivered Increment
zhlédnutí 629Před měsícem
PMP Exam Practice Question and Answer -147 : Dissatisfaction With The Delivered Increment
The significance of active listening skills for coaches & leaders.
zhlédnutí 107Před měsícem
The significance of active listening skills for coaches & leaders.
PMP Exam Practice Question and Answer -146 : Team Frequently Misunderstands the Requirements
zhlédnutí 790Před měsícem
PMP Exam Practice Question and Answer -146 : Team Frequently Misunderstands the Requirements
Accredited coach training with Professional Coaching & Leadership Program (ICF-ACC)
zhlédnutí 75Před měsícem
Accredited coach training with Professional Coaching & Leadership Program (ICF-ACC)
Episode 7: How Do You Define and Measure Success for Yourself and Your Project Team?
zhlédnutí 1,1KPřed měsícem
Episode 7: How Do You Define and Measure Success for Yourself and Your Project Team?
Empowering Strategies: Coach as a Leader by Karen Borain
zhlédnutí 114Před měsícem
Empowering Strategies: Coach as a Leader by Karen Borain
Episode 6: Handling Conflicting stakeholder Priorities - Essential Skills for Project Managers
zhlédnutí 960Před měsícem
Episode 6: Handling Conflicting stakeholder Priorities - Essential Skills for Project Managers
PMP Exam Practice Question and Answer -145 : Cost / Benefit of A/B Testing
zhlédnutí 314Před měsícem
PMP Exam Practice Question and Answer -145 : Cost / Benefit of A/B Testing
Why do we need a coach? by Karen Borain
zhlédnutí 111Před měsícem
Why do we need a coach? by Karen Borain
PMP Exam Practice Question and Answer -144 : Cumulative Flow Diagram (CFD)
zhlédnutí 375Před měsícem
PMP Exam Practice Question and Answer -144 : Cumulative Flow Diagram (CFD)
PMP Exam Practice Question and Answer -143 : Finding Better Page Version
zhlédnutí 281Před měsícem
PMP Exam Practice Question and Answer -143 : Finding Better Page Version
PMP Exam Practice Question and Answer -142 : Burndown Chart
zhlédnutí 372Před měsícem
PMP Exam Practice Question and Answer -142 : Burndown Chart
Episode 5: Mastering Task Prioritization - Essential Skills for Project Managers
zhlédnutí 1,1KPřed měsícem
Episode 5: Mastering Task Prioritization - Essential Skills for Project Managers
PMP Exam Practice Question and Answer -141 : Future Iteration Risk
zhlédnutí 266Před měsícem
PMP Exam Practice Question and Answer -141 : Future Iteration Risk
PMP Exam Practice Question and Answer -140 : Team Member Struggling to Communicate
zhlédnutí 342Před měsícem
PMP Exam Practice Question and Answer -140 : Team Member Struggling to Communicate
Episode 9: Enablers in SAFe
zhlédnutí 365Před měsícem
Episode 9: Enablers in SAFe
PMP Exam Practice Question and Answer -139 : MBTI assessments
zhlédnutí 248Před měsícem
PMP Exam Practice Question and Answer -139 : MBTI assessments
Episode 4: Mastering Conflict in Teams : Interview Guide with Real Examples
zhlédnutí 1,3KPřed 2 měsíci
Episode 4: Mastering Conflict in Teams : Interview Guide with Real Examples
PMP Exam Practice Question and Answer -138 : Mentoring amid tight budget constraints
zhlédnutí 208Před 2 měsíci
PMP Exam Practice Question and Answer -138 : Mentoring amid tight budget constraints

Komentáře

  • @rajeswarikv9396
    @rajeswarikv9396 Před 8 hodinami

    Mind-blowing Saket..Wishing you more and more success..IMHO you should be some where else, like with scrum founders and to make scrum guide and process complete.🎉😊

  • @NishaUchil
    @NishaUchil Před 18 hodinami

    This video is going to help a lot of people. The candidate's confusion clearly stated that many companies are still comfortable with waterfall and such candidates struggle to understand the requirements of consulting firms.

  • @Aboodiakm
    @Aboodiakm Před 23 hodinami

    Beautiful explanation from the first time I understand what is Funding limit reconciliation

  • @sunstar781
    @sunstar781 Před dnem

    Is she really a program manager too

  • @nithyashrir588
    @nithyashrir588 Před dnem

    It would be great if you do another workshop on user story writing ..it helps all youtubers

  • @rajeswarikv9396
    @rajeswarikv9396 Před 2 dny

    Is there a feedback cycle from customer in Waterfall , other than the one at the end - closure of Project ? Saket , Is there a video on complete Agile SDLC including documentation like Traditional PM approach ?

    • @izenbridge
      @izenbridge Před dnem

      Waterfall needs to be designed with feedback cycle, unlike Scrum , waterfall does not have certification or any recommendation so it depend on how we design. The PMP program helps in learning how to design a process which helps in delivery value.

  • @olabisibabayemi
    @olabisibabayemi Před 4 dny

    great stuff!

  • @varundutta2381
    @varundutta2381 Před 5 dny

    In one of the interview I was asked this question "In a new project what should be created first - Product Backlog or an Agile team ?"

    • @izenbridge
      @izenbridge Před 4 dny

      I think it depend on context, since Scrum does not recommend anything to do with Project, for scrum way of working team is always formed and ready and we bring work to team, but that work not necessary a project it should be a product. In project management the creating of Project is first thing and than we create team, product backlog in project context is complex since it may be in exist before you are doing second version of the existing product, or if you are doing first version , you may create after starting the project with project team . I think interviewer just wanted to see the approach of answer rather than a given answer

  • @Lima3578user
    @Lima3578user Před 6 dny

    Can you please do a video on budgeting and P and L in a software product company

    • @izenbridge
      @izenbridge Před 4 dny

      Sorry, we are experienced in educating on project management than teaching how to manage product companies

  • @RoshV-hj2bf
    @RoshV-hj2bf Před 7 dny

    Great session & very clearly explained, good job

  • @girishjaiswal1377
    @girishjaiswal1377 Před 7 dny

    Thanks for the content. Explained well 🙂

  • @trivedigmt
    @trivedigmt Před 8 dny

    In my opinion first step shud be D and than B my answer D shows incorrect

    • @izenbridge
      @izenbridge Před 7 dny

      Not sure what you mean when you say D is showing incorrect since our answer is D only. Can you point out where you see D as incorrect?

    • @trivedigmt
      @trivedigmt Před 7 dny

      It was from a mock exam online , correct answer was B and explanation was that since the change is already being informed PM should update the document first however as per my understanding no matter what be the situation before updating one should alsways discuss and than update

    • @izenbridge
      @izenbridge Před 7 dny

      @@trivedigmt I agree and also you have lots of questions in our exams so may be you want to focus on them more. In general when questions is not clear, we follow Acknowledge the problem followed by Analyze the problem and than Act on the problem.

  • @trivedigmt
    @trivedigmt Před 8 dny

    During the development of a new residential area, a recently enacted zoning law changes the permissible building heights within the project's area. The project team has been informed of this change. What is the most effective course of action for the project manager to take? A. Review the project's design plans to ensure they comply with the new zoning law B. Update the project documentation to reflect the change in zoning laws and its impact on the project scope C. Schedule a meeting with local government officials to seek exceptions for the current project D. Consult with legal counsel to understand the implications of the zoning law change on the project

    • @izenbridge
      @izenbridge Před 7 dny

      Please share the source of this question, because the right answer should be D, followed by B or A .

  • @trivedigmt
    @trivedigmt Před 8 dny

    I have a question

  • @reenayadav7271
    @reenayadav7271 Před 8 dny

    Amazing explanation ❤

  • @rajeswarikv9396
    @rajeswarikv9396 Před 8 dny

    Perfect upto the point..

  • @hasnain4186
    @hasnain4186 Před 8 dny

    Cleaner Simpler sir ,well done ..

  • @varundutta2381
    @varundutta2381 Před 9 dny

    In one of the interview I was asked the question " How do you know that your project is in control " ?

    • @izenbridge
      @izenbridge Před 6 dny

      Sorry Missed commend, yesterday we spoke about Estimation and Tracking the estimate, may want to check : czcams.com/users/liveeAxnto4Nc0w Its all about keeping our regular metrics and progress visible and in check so we know we are meeting stakeholder expectations and moving towards project objectives

  • @rajeswarikv9396
    @rajeswarikv9396 Před 9 dny

    EvenThough Trust is one of the scrum value, how to trust development team estimation in refinement sessions!? SM ,PO can never know if its more or less

    • @izenbridge
      @izenbridge Před 9 dny

      If it is less , people will take more time , if it is more team will finish early, so the assumption is its collaborative and transparent system, where we estimate as plan and reality is going to be different but when we know reality we adapt. Scrum will not work where you have people who are lazy and hide information. If that is the case, you need to fix that problem first or use something else because scrum is not designed for that team. Scrum is founded on Trust

  • @rajeswarikv9396
    @rajeswarikv9396 Před 9 dny

    1.Can we use Throughput (flow metric) of past sprint for better plannings (Since velocity is relative and does not help much) ? But Throughput (no of items closed) also varies based on volume of work , risk , dependencies etc - In this case how can it be used or forecasting and sprint planning accurately? 2. When we use Historical velocity data of Story Points , how to subtract the capacity (of team's non available hours ) for a better sprint planning as we dont have relation between capacity and velocity ?

    • @izenbridge
      @izenbridge Před 9 dny

      Throughput matrices is only used when you similar type of work, and usually the Kanban style , usually the sprint planning is done based on commitment. Here are some videos which can clarify czcams.com/video/d1QPl8WOOG0/video.htmlsi=I88_LItrkP4s3C9W czcams.com/video/lvcNbko_AmY/video.htmlsi=kXqvC5NG_pW2aIZT

  • @rajeswarikv9396
    @rajeswarikv9396 Před 9 dny

    Can we say this is as overall cycle time for the issues closed on those days ?

  • @abhishekjain6536
    @abhishekjain6536 Před 9 dny

    I think in a bit different way. I feel tester can share their knowledge with the development team. Example what all scenarios testers are planning to test. This way dev will get to knwo what all scenarios he may miss while coding. This is also a good example of better collaboration

    • @izenbridge
      @izenbridge Před 9 dny

      Thank you for your Contribution

  • @prashik3739
    @prashik3739 Před 9 dny

    Dear Saketh very nice clarifications and great guidance . Love this. In this you have been covered mostly traditional project management. Looking forward for a case study with end to end agile project management.

  • @RisheeshMishra
    @RisheeshMishra Před 10 dny

    Why is Prateek Kuhad giving a Jira Training?

  • @aakashdeepsaxena4146
    @aakashdeepsaxena4146 Před 11 dny

    How fast-tracking occurs without adding resources. Don't we need more resources to start task B while A is in progress?

  • @abhimanyuraibhagi1716

    Amazing Response, cut through clutter and gives precise explanation

  • @kishork80
    @kishork80 Před 13 dny

    This is an amazing tool and awesome demo by Saket Sir :)

    • @izenbridge
      @izenbridge Před 13 dny

      Thank you for checking it out.

  • @izenbridge
    @izenbridge Před 13 dny

    PMP With iZenBridge, WhatsApp Community to get frequent update on our various PMP Related Posts and Resources chat.whatsapp.com/GCA2exYiklgD5MwCdq4Soo

  • @SwatiinUSA
    @SwatiinUSA Před 13 dny

    Sprint retrospective is for team work improvement, what was good about the sprint, what didn’t work and what can we do to improve it for next sprint. D should be the correct answer instead

    • @izenbridge
      @izenbridge Před 13 dny

      If you are preparing for PMP, my recommendation is to read the options , even if we go with Pure Scrum, it clearly adds the Product Owner to the Sprint Retrospective and also Scrum Includes Product Owner as part of Scrum Team and Sprint Retrospective is expected to improve Scrum Team , which includes PO. This is the reason i added the Option D to make learner clear about the question, all these questions and options are designed by us for improving clarity of concepts , I do recommend check the videos if not doing already since just reading the question is may not give the desired value, because i have clarified the same in video

  • @SwatiinUSA
    @SwatiinUSA Před 13 dny

    I have never heard of mid sprint review meeting and sprint review is done with the stakeholders to show them the work done in a particular sprint

    • @izenbridge
      @izenbridge Před 13 dny

      Yes its not the usual thing , and scrum does not have such things, when we have options in PMP exam, we need to select out of the available one and for that we need to get into fundamental solutions, say solution is collaboration, and then see which existing practice or new practice can solve it . This is the way we should our ability to do right tailoring or adaption in PMP exam.

  • @pvs108
    @pvs108 Před 14 dny

    Saket Sir after a long time. How are you?

    • @izenbridge
      @izenbridge Před 14 dny

      Hi, good to connect, thank you for comment

  • @imranabdulrahim8000
    @imranabdulrahim8000 Před 15 dny

    Is project manager here is the scrum master?

    • @izenbridge
      @izenbridge Před 14 dny

      When you see Scrum Master role is played by someone else in question, you give that person team leadership role, but the question does not show you have scrum master than you do team leadership role , you may want check this episode which was made for same topic : czcams.com/users/livedbTDKClunAA?si=c9VXZ5dD5m_xvfYk

  • @imranabdulrahim8000
    @imranabdulrahim8000 Před 15 dny

    I like your explanation

    • @izenbridge
      @izenbridge Před 13 dny

      Thank you for checking it out.

  • @sandipagrawaltalks
    @sandipagrawaltalks Před 15 dny

    Sounds great

  • @sudhanshusharma82
    @sudhanshusharma82 Před 15 dny

    Saket sir, I had a question regarding Velocity. If historical velocity of a scrum team is 30 and in one of the sprints, the team could not complete a 5 pointer story. What will be the velocity of that particular sprint?

    • @izenbridge
      @izenbridge Před 15 dny

      Velocity of given sprint is Sum total of the story points completed (met DoD) in given sprint , it has not much to do what was the history of velocity.

  • @moneshkankane1951
    @moneshkankane1951 Před 17 dny

    Please be on point lot of beating about the bush

    • @izenbridge
      @izenbridge Před 17 dny

      Thank you for taking time to share your feedback.

  • @ChhaviGupta-fx8ts
    @ChhaviGupta-fx8ts Před 17 dny

    Thanku sir for this video.

  • @Shweta-k
    @Shweta-k Před 17 dny

    Saket sir, I like the way you explain and give that big picture. Your perspective has always helped me with my interviews thank you so much...

    • @izenbridge
      @izenbridge Před 17 dny

      Thank you for sharing your feedback. happy to know you liked the content.

  • @Shweta-k
    @Shweta-k Před 17 dny

    i want to know if she got the job,... interviewers are snapping alot looks like lol.. not a good culture to work in such environment..

  • @hk7294
    @hk7294 Před 19 dny

    Good one

  • @NishaUchil
    @NishaUchil Před 19 dny

    I have been asked in one of the interviews, How do I manage strict budget for the project while following SCRUM. Interviewer specifically told me there will not be any kind of adjustments in terms of extra resources.

    • @izenbridge
      @izenbridge Před 19 dny

      I think person want to see your approach , i would say why do we want to use Sprint in such case? mean does fix budget mean fix scope or fix capacity only, if its fix capacity we need to ensure whatever gets done in that time its good, so we prioritize, if its fix scope, we ensure we apply proper process to budget the changes.