![Flashing Red Productions](/img/default-banner.jpg)
- 1 692
- 1 205 157
Flashing Red Productions
United Kingdom
Registrace 2. 11. 2014
Welcome to Flashing Red Productions!
My name is Will, and I’m a railway enthusiast based in the UK - more specifically in the West Midlands.
On this channel you will primarily find videos of level crossings in the UK, and occasionally other railway related material.
I only make videos as a hobby, so no video requests please. I simply do not have the time to take requests and wouldn’t enjoy making videos as a result.
Videos are released on:
- Monday at 17:00 (5:00pm) UK Time
- Friday at 17:00 (5:00pm) UK Time
Please do not re-publish any videos of mine without my prior permission. If you would like to use any of my videos for any reason, please contact me via email.
If you enjoy what you see, please like, comment, share, subscribe, and turn on notifications!
Thanks for reading!
My name is Will, and I’m a railway enthusiast based in the UK - more specifically in the West Midlands.
On this channel you will primarily find videos of level crossings in the UK, and occasionally other railway related material.
I only make videos as a hobby, so no video requests please. I simply do not have the time to take requests and wouldn’t enjoy making videos as a result.
Videos are released on:
- Monday at 17:00 (5:00pm) UK Time
- Friday at 17:00 (5:00pm) UK Time
Please do not re-publish any videos of mine without my prior permission. If you would like to use any of my videos for any reason, please contact me via email.
If you enjoy what you see, please like, comment, share, subscribe, and turn on notifications!
Thanks for reading!
Lower Howsell Road (Footpath) Level Crossing (Worcestershire) 05/07/2024
Filmed at:
09:42
Timetable Used: Malvern Link
Crossing Type: OMSL-FP
Route: Cotswold Line
Equipment:
- 2 Schweizer VAMOS MSLs
Filmed with:
@JTCrossingsUK
09:42
Timetable Used: Malvern Link
Crossing Type: OMSL-FP
Route: Cotswold Line
Equipment:
- 2 Schweizer VAMOS MSLs
Filmed with:
@JTCrossingsUK
zhlédnutí: 201
Video
Llandrindod Wells Level Crossing (Powys) 16/06/2024
zhlédnutí 148Před 12 hodinami
Filmed at: 13:47 Timetable Used: Llandrindod Crossing Crossing Type: TMOB Route: Heart of Wales Line Equipment: - 5 Unipart Rail LED wigwags - 4 SPX Rail Systems barriers - 2 E2S Appello Sounders - 2 Unipart Dorman LED DCIs - 1 Unknown LED Floodlights
Dolau Station Level Crossing (Powys) 16/06/2024
zhlédnutí 175Před 21 hodinou
Filmed at: 13:20 Timetable Used: Dolau Crossing Type: AOCL B Route: Heart of Wales Line Equipment: - 4 Unipart Rail LED wigwags - 2 SPX Rail Systems barriers - 2 Yodalarms - 2 Unipart Dorman LED DCIs - 2 Unknown LED Floodlights
Burdett Farm (Bridlepath) Level Crossing (Gloucestershire) 25/05/2024
zhlédnutí 386Před dnem
Filmed at: 16:43 (Video 1) 16:50 (Video 2) Timetable Used: Cheltenham Spa Crossing Type: OMSL-FP Route: Cross Country Route Equipment: - 2 Schweizer MSL Units with Sounders Video 1: 0:00 Video 2: 0:44
Swindon Road Level Crossing (Gloucestershire) 25/05/2024
zhlédnutí 201Před 14 dny
Filmed at: 16:23 Timetable Used: Cheltenham Spa Crossing Type: MCB-CCTV Route: Cross Country Route Equipment: - 4 Unipart Rail LED wigwags - 2 SPX Rail Systems barriers - 2 Yodalarms
(Faulty Yodalarm) Morris Hill Level Crossing (Gloucestershire) 25/05/2024
zhlédnutí 381Před 14 dny
Filmed at: 15:41 & 15:53 Timetable Used: Cheltenham Spa Crossing Type: MCB-CCTV Route: Cross Country Route Equipment: - 4 Unipart Rail LED wigwags - 4 SPX Rail Systems barriers - 2 Yodalarms Video 1: 0:00 Video 2: 3:05
Alstone Level Crossing (Gloucestershire) 25/05/2024
zhlédnutí 290Před 21 dnem
Filmed at: 14:57 & 15:03 Timetable Used: Cheltenham Spa Crossing Type: MCB Route: Cross Country Route Equipment: - 4 Unipart Rail LED wigwags - 4 SPX Rail Systems barriers - 2 Yodalarms Video 1: 0:00 Video 2: 2:25
SVR Spring Diesel Gala Action at Northwood Level Crossing (Worcestershire) 17-19/05/2024
zhlédnutí 486Před 21 dnem
The Severn Valley Railway Spring Diesel Gala (2024) at Northwood Level Crossing, taken on three consecutive days. Featuring a variety of diesel locomotives such as: HST, Class 20s, Class 37, Class 33, Class 40, Class 46, Class 50, Class 73, & Class 52s. Filmed at: 17/05/2024 - 10:42, 11:32, 12:01, 12:21, 12:48, 13:08, 13:27, 13:46, 13:57, 14:20, 14:39, 14:54, 15:12, 15:40, 16:08, & 16:25. 18/05...
(Night Mode) Late Night Shots at Hartlebury Station Level Crossing (Worcestershire) 10/05/2024
zhlédnutí 225Před 28 dny
Time(s) Filmed: 22:44, 23:12 Timetable Used: Hartlebury Crossing Type: MCB-CCTV Route: Snow Hill Line Equipment: - 4 Unipart Rail LED wigwags - 3 Smiths Industries barriers, 1 SPX Rail Systems barrier - 2 Yodalarm YO3/RF2s Intro: 0:00 Video 1: 0:24 Video 2: 4:00
Oddingley Level Crossing (Worcestershire) 05/05/2024
zhlédnutí 204Před měsícem
Time(s) Filmed: 13:22, 13:26, 13:32 Timetable Used: Stoke Works Jn Crossing Type: MCB-OD Route: CrossCountry Route Equipment: - 4 Unipart Rail LED wigwags (3 normal, 1 narrow) - 2 SPX Rail Systems barriers - 2 Yodalarm YO3/RF2s - 6 Lidars - Honeywell Radar Video 1: 0:00 Video 2: 2:52 Video 3: 5:20
(Previously Unpublished Clips) Blakedown Station Level Crossing (Worcestershire) Nov 2023 - Mar 2024
zhlédnutí 575Před měsícem
(Previously Unpublished Clips) Blakedown Station Level Crossing (Worcestershire) Nov 2023 - Mar 2024
ABANDONED Fosseway Level Crossing (Staffordshire) 05/04/2024
zhlédnutí 258Před měsícem
Filmed at: 12:54 Crossing Type: AHB Route: Litchfield to Brownfields Line (Disused) Equipment: - 4 GEC Halogen Wigwags - 1 Smiths Industries barrier (arm missing) - 2 Yodalarms (both missing their fronts) Located near Lichfield, on the Lichfield to Brownhills Line, this crossing has been disused since 2001. Since then, the track has been fenced off on both sides of the road. Despite being disus...
(Rare Barriers, No Alarms) Puxton & Worle Level Crossing (Somerset) 22/03/2024
zhlédnutí 499Před měsícem
Time(s) Filmed: 12:47, 13:12, 13:30, 13:43 Timetable Used: Worle Crossing Type: MCB Route: Bristol to Exeter Line Equipment: - 5 Unipart Rail LED wigwags - 4 BR WR barriers Video 1: 0:00 Video 2: 2:30 Video 3: 6:09 Video 4: 10:24
(Rare Barriers) Huish Level Crossing (Somerset) 22/03/2024
zhlédnutí 574Před měsícem
Time(s) Filmed: 11:29, 11:41, 11:50, 12:16 Timetable Used: Yatton Crossing Type: MCB-CCTV Route: Bristol to Exeter Line Equipment: - 4 Unipart Rail LED wigwags - 2 BR WR barriers - 2 Yodalarms Video 1: 0:00 Video 2: 4:14 Video 3 (2 Lowerings): 10:33 Video 4: 14:45
(New Yodalarm) Ashford Bowdler Level Crossing (Shropshire) 09/03/2024
zhlédnutí 157Před měsícem
Time(s) Filmed: 15:16 & 15:24 Timetable Used: Woofferton Crossing Type: AHB Route: Welsh Marches Line Equipment: - 4 Unipart Rail LED wigwags - 2 SPX Fluid Power barriers - 2 Yodalarms Video 1: 0:00 Video 2: 0:44
Henwick Level Crossing (Worcester) 08/03/2024
zhlédnutí 206Před měsícem
Henwick Level Crossing (Worcester) 08/03/2024
(Road Closed) Pirton Level Crossing (Worcestershire) 08/03/2024
zhlédnutí 352Před měsícem
(Road Closed) Pirton Level Crossing (Worcestershire) 08/03/2024
Rhydwhyman (User Worked) Level Crossing (Powys) 17/02/2024
zhlédnutí 114Před 2 měsíci
Rhydwhyman (User Worked) Level Crossing (Powys) 17/02/2024
Abermule Level Crossing (Powys) 17/02/2024
zhlédnutí 170Před 2 měsíci
Abermule Level Crossing (Powys) 17/02/2024
Woodbridge Haywards Level Crossing (Suffolk) 15/02/2024
zhlédnutí 201Před 2 měsíci
Woodbridge Haywards Level Crossing (Suffolk) 15/02/2024
Woodbridge Ferry Lane Level Crossing (Suffolk) 15/02/2024
zhlédnutí 286Před 2 měsíci
Woodbridge Ferry Lane Level Crossing (Suffolk) 15/02/2024
Woodbridge Lime Kiln Level Crossing (Suffolk) 15/02/2024
zhlédnutí 306Před 2 měsíci
Woodbridge Lime Kiln Level Crossing (Suffolk) 15/02/2024
Woodbridge Sun Wharf Level Crossing (Suffolk) 15/02/2024
zhlédnutí 242Před 2 měsíci
Woodbridge Sun Wharf Level Crossing (Suffolk) 15/02/2024
Bealings Level Crossing (Suffolk) 15/02/2024
zhlédnutí 235Před 2 měsíci
Bealings Level Crossing (Suffolk) 15/02/2024
Westerfield Station Level Crossing (Suffolk) 15/02/2024
zhlédnutí 331Před 2 měsíci
Westerfield Station Level Crossing (Suffolk) 15/02/2024
(2 Faulty Yodalarms) Melton Station Level Crossing (Suffolk) 15/02/2024
zhlédnutí 356Před 2 měsíci
(2 Faulty Yodalarms) Melton Station Level Crossing (Suffolk) 15/02/2024
Ufford Level Crossing (Suffolk) 15/02/2024
zhlédnutí 196Před 3 měsíci
Ufford Level Crossing (Suffolk) 15/02/2024
Blaxhall Level Crossing (Suffolk) 15/02/2024
zhlédnutí 206Před 3 měsíci
Blaxhall Level Crossing (Suffolk) 15/02/2024
Beversham Level Crossing (Suffolk) 15/02/2024
zhlédnutí 241Před 3 měsíci
Beversham Level Crossing (Suffolk) 15/02/2024
Saxmundham Chantry Road Level Crossing (Suffolk) 15/02/2024
zhlédnutí 443Před 3 měsíci
Saxmundham Chantry Road Level Crossing (Suffolk) 15/02/2024
It's crazy how fast that train comes up after how long the signal is red. It's like it's goading you into crossing but by the time you consider it the train is already upon you.
Great video 👍
Caged lights
Great video!
Great video and crossing 👍
Nothing stops the little red Post Brenhinol van. ‘Landod’ Recently modernised by the biggest signalling contractor.
1:04 that alarm went a bit doggy lol
Nice video!
Two-tone alarm? There's barely one tone to begin with!
Does anyone know what that little door with a red light at 00:34 in the video. I have seen these on a lot of boxes, but always wondered why it was a small little box, why not just put whatever is inside in the main box. Who would access that cupboard. And what is the red light for as I often see it on.
Great video as always 👍
Great video 👍
Great videos!
Great video and nice crossing! Wonder what's wrong with that one alarm to make it sound like that?
Nice video and crossing!
Great video and crossing 👍
I needed to know why they couldn’t dig a tunnel and do an extension for most of the mainline Trains so that they could extend the unused abandoned underground train stations. Why couldn’t they use the part D78 Stock train doors on the sides and also restructure the front face of the A60 and A62 stock which will include the class 507, class 508, class 313, class 314 and class 315 remix and make them all together and also redesign all of them into an overhead wire line trains and also make most of them into Five carriages per units and also having three Disabled Toilets on those Five cars per units A60 and A62 stock trains and also convert the A60 and A62 stock trains into a Gardner 6LXC, Cummins M11, Scania N112, Volvo B10M, Gardner 6LXB, Gardner LG1200 and Gardner 8LXB Diesel Engines and also put the Loud 8-Speed Voith Gearboxes even Loud 10-Speed Leyland Hydra cyclic Gearboxes in the A60 and A62 stock, class 507, class 508, class 313, class 314, and class 315 and also modernise the A60 and A62 stock and make it into 11 carriages per unit so it could have fewer doors, more tables, computers and mobile phone chargers? A Stock Train and 8 Disabled Toilets on those A stock trains. why couldn’t we refurbish and modernise the waterloo and city line Triple-Track train tunnel and make it even much more Larger and extend it to the bank station, making it into a Triple-Track Railway Line so those Five countries such as Australia, Germany, Italy, Poland And Sweden to convert the waterloo and city line Triple-Track Railway tunnel into a High-Speed Railway lines? The Third Euro tunnel Triple-Track Railway line to make it 11 times better for passengers so they could go from A to B. Then put the modernised 11 carriages per unit A Stock and put them on a bigger modernised Waterloo and city line Triple-Track train tunnel so it could go to bank station to those Five countries such as Australia, Germany, Italy, Poland And Sweden. The modernised refurbished 11 carriages per unit A stock could be a High Speed The Third Triple-Track Euro Tunnel Train So it is promising and 47 times a lot more possible to do this kind of project if that will be OK for London Australia, Germany, Italy, Poland And Sweden. oh by the way, could they also tunnel the Triple-Track Railway Line so it will stop from Buckinghamshire, Hertfordshire and Essex so that the Passengers will go to Australia, Germany, Italy, Poland and Sweden and also extend the Triple-Track Railway Line from the Bank to Buckinghamshire, Hertfordshire and Essex Stations so that more people from there could go to Australia, Germany, Italy, Poland And Sweden more Easily. Why couldn't they extend the Piccadilly Line and also build brand-new underground train stations so it could go even further right up to Clapton, Wood Street can they also make another brand new underground train station in Chingford and could they extend the Piccadilly Line and the DLR right up to Chingford? All of the classes 150, 155, 154, 117, 114, 105, and 106, will be replaced by all of the Gardner 6LXC, Cummins M11, Volvo B10M, Gardner 6LXB, Scania N112, Gardner LG1200 and Gardner 8LXB Diesel Five carriages three disabled toilets are air conditioning trains including Highams Park for extended roots which is the Piccadilly line and the DLR trains. Could you also convert all of the 1973 stock trains into an air-conditioned maximum speed 78 km/hours (48 MPH) re-refurbished and make it into a 8 cars per unit if that will be alright, and also extend all of the Piccadilly train stations to make more space for all of the extended 8 car per unit 1973 stock air condition trains and can you also build another Mayflower and Tornado Steam Locomotive Companies and can they order Every 87 Octagon and Every 48 Hexagon shape LNER diagram unique small no.13 and unique small no.11 Boilers from those Countries such as Greece, Italy, Poland, and Sweden, can they make Mayflower and Tornado Steam Locomotive speeds by up to 147MPH so you can try and test it on the Original Mainline so it will be much more safer for the Passengers to enjoy the 147MPH speed Limit only for HS2 and Channel Tunnel mainline services, if they needed 16 Carriages Per units, can they use those class 55’s, class 44’s, class 40’s and class 43HST Diesel Locomotive’s right at the Back of those 18 Carriages Per Units so they can take over at the Back to let those Mayflower and Tornado Steam Locomotive’s have a rest for those interesting Journeys Please!!!!!!!!!!!!, oh can you make all of those 18 Tonne Boxes of Coal for all of those 147MPH Mayflower and Tornado Steam Locomotive’s so the Companies will Understand us PASSENGER’S!!!! So please make sure that the Builders can do as they are told!!!!! And Please do something about these very very important Professional ideas Please? Prime Minister of England, Prime Minister of Australia, Prime Minister of Sweden, Prime Minister of Germany, Prime Minister of Italy, Prime Minister of Poland and that Includes the Mayor of London.
Well that is so good work! Hopefully it's finished.
Great video and crossing 👍
Don’t see that alarm getting replaced any time soon…
Because i when in bristol then in filton i swear i did not see that level crossing
Great video! Looks like the gate arm closest to you in the first clip had a new skirt on it? Looks cleaner than the rest. Wonder what the IET was sitting in the spur next to the crossing for?
I don’t think that’s a new skirt or arm in the first clip. Pretty sure it’s the same one that was there when the crossing was brand new. The IET in the siding was waiting to be given the route back into Cheltenham Spa station, where it would then form a passenger service to London.
Great video and crossing 👍
Nice! Sounds a bit like the old trencreek.
Nice! I miss the old setup here.
Great Video! That broken skirt was just like the one at Navigation Road!
Amazing video keep up the fantastic work and also pls do more awsome video
Great video as always 👍
Nice Videos! Some great Action there! 👍🏻
Very good video. I recorded this crossing in May. Surprised that the flat alarm hasn't been replaced yet tbh.
Great video! I love HSTs
I see they STILL haven't replaced that faulty alarm yet. Nice to see they've donated some XC MK3's.
I recorded two videos there exactly 1 week later after the Diesel Event and one of the alarms is basically in dire need of replacement. If they do replace it then that'll be great. This crossing has had quite bad alarms in the past few years.
Train is coming in 16:42
Too good
I know
Great video!
Great video 👍
How on earth does this have 3 Smiths Ind. barriers when this crossing got upgraded in like 2011/2012? (And it had NRS barriers too) Are they spare ones from another crossing?
Blakedown has one smiths too
@@mkasrailwaysliftsmore8005 They were new-old-stock from 1994.
Great video! That crossing's definitely in quite a bit of a state of decay, I wonder what happened to the one gate mech? The one wigwag having fallen to its side was slightly amusing as well. I also have to wonder if the alarm speakers/internals and phones were intentionally removed, or if they were stolen by scrappers.
It does make me wonder what happened to the one barrier pedestal. One of them is still here, but is completely covered in ivy.
Great video!
Great video as always 👍
4:13 Lower set 2!
How many volts
Nice video! Weird seeing an AHB with a signal box next to it.
Yeah it is strange. Thanks 👍
Nice compilation 👍
Normalement, pour un SAL 4 sur une ligne parcouru à moin de 140 km/h le délai d'annonce est de 35 s. Mais là pour des raisons de coordination avec les feux de circulation le délai à été majoré. De plus depuis le début de la vidéo la lempe du téléphone d'urgence est allumé, ce qui prouve que l'annonce à déjà été déclenché avant même le fonctionnement du PN.
0:00 STARTING acvton 1
4:14 huish LC again
Great vid, is there any other locations that have these type of barriers?
Great video as always 👍