Naeem Ali
Naeem Ali
  • 28
  • 60 216

Video

CBTC Explained - e-Learning for Rail Professionals
zhlédnutí 997Před rokem
CBTC e-Learning series - Learn at your own pace CBTC Explained for Rail Professionals is an online introductory CBTC overview course designed to get your feet wet as it relates to CBTC technologies. Upgrade your skills, register now for this e-learning course now at CBTCSolutions.ca/cbtc-explained Created by Naeem Ali a CBTC Specialist.
CBTC Training - E-Learning for Rail Professionals
zhlédnutí 742Před rokem
CBTC e-Learning series CBTC Explained for Rail Professionals is an online introductory CBTC overview course designed to get your feet wet as it relates to CBTC technologies. Upgrade your skills, register now for this e-learning course now at CBTCSolutions.ca/cbtc-explained Created by Naeem Ali a CBTC Specialist.
GoA 4 - Unattended Train Operations (UTO)
zhlédnutí 1,2KPřed rokem
At the GoA 4, the system is fully automated, there are no drivers or operations staff on-board the train. CBTCSolutions.ca
GoA 3 - Driverless Train Operations (DTO)
zhlédnutí 716Před rokem
A GoA 3 system is taking more control of the subway infrastructure. A train driver is no longer required but operation staff are required at the platforms
GoA 2 - Semi Automated Train Operation (DTO)
zhlédnutí 1,1KPřed 2 lety
Grade of Automation 2 (GoA 2) is where the core automation functionality is introduced. At this level, the train driver does not control propulsion or braking. CBTCSolutions.ca
GoA 1 - Non Automated Train Operation
zhlédnutí 889Před 2 lety
A GoA 1 system is a conventionally signalled system, common to the majority of subway and metros around the world. CBTCSolutions.ca
GoA 0 - Line of Sight Operation
zhlédnutí 259Před 2 lety
Grade of Automation or GoA 0 is a system that operates exclusively off of operating procedures. There is no signalling system to protect the trains. CBTCSolutions.ca
Grades of Automation (GoA) Introduction
zhlédnutí 529Před 2 lety
IEC 62290-1 defines the Grades of Automation levels an urban transit can be classified for. This clip is introduces the topic.
IEEE 1474.1 - The Main CBTC Standard
zhlédnutí 619Před 4 lety
If there is one standard about CBTC that your should understand, it is IEEE 1474.1. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
Types of CBTC Architectures
zhlédnutí 1,2KPřed 4 lety
CBTC designs are not the same but they fall into 1 of 3 types of CBTC architectures. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
ATS - The Third Building Block of a CBTC System
zhlédnutí 1,7KPřed 4 lety
A CBTC system is made up of 3 build blocks: ATP - Automatic Train Protection ATO - Automatic Train Operation ATS - Automatic Train Supervision This video provides further details regarding the ATS building block. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
ATO - The Second Building Block of a CBTC System
zhlédnutí 985Před 4 lety
A CBTC system is made up of 3 build blocks: ATP - Automatic Train Protection ATO - Automatic Train Operation ATS - Automatic Train Supervision This video provides further details regarding the ATO building block. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
ATP - The First Building Block of a CBTC System
zhlédnutí 2,2KPřed 4 lety
A CBTC system is made up of 3 build blocks: ATP - Automatic Train Protection ATO - Automatic Train Operation ATS - Automatic Train Supervision This video provides an overview of the three build blocks and goes into further details regarding the ATP. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
CBTC Configurations
zhlédnutí 761Před 5 lety
IEEE 1474.1 has defined three main CBTC building blocks: ATP - Automatic Train Protection ATO - Automatic Train Operation ATS - Automatic Train Supervision Using these building blocks, three different CBTC configurations are possible: 1. ATP only 2. ATP with some ATO and ATS 3. Full ATP, ATO and ATS functionality This video explores and describes each configuration. Naeem Ali CBTC Specialist Di...
Types of Signalling Systems
zhlédnutí 4,4KPřed 5 lety
Types of Signalling Systems
What is CBTC?
zhlédnutí 2,7KPřed 5 lety
What is CBTC?
CBTC 101: CBTC Concepts, Standards and Architectures
zhlédnutí 20KPřed 5 lety
CBTC 101: CBTC Concepts, Standards and Architectures
Conclusion
zhlédnutí 165Před 6 lety
Conclusion
Step 6: Write the ConOps
zhlédnutí 1,5KPřed 6 lety
Step 6: Write the ConOps
Step 5: Establish System Boundaries & Interfaces
zhlédnutí 783Před 6 lety
Step 5: Establish System Boundaries & Interfaces
Step 4: Determine System Operations
zhlédnutí 485Před 6 lety
Step 4: Determine System Operations
Step 3: Translate User Priorities into System Capabilities
zhlédnutí 622Před 6 lety
Step 3: Translate User Priorities into System Capabilities
Step 2: Define CBTC Users and their Priorities
zhlédnutí 579Před 6 lety
Step 2: Define CBTC Users and their Priorities
Step 1: Establish a Working Group
zhlédnutí 440Před 6 lety
Step 1: Establish a Working Group
Why Do I need a ConOps?
zhlédnutí 975Před 6 lety
Why Do I need a ConOps?
What is a ConOps?
zhlédnutí 6KPřed 6 lety
What is a ConOps?
6 Steps to Create a Concept of Operations Document in a CBTC Application (Full Video)
zhlédnutí 7KPřed 6 lety
6 Steps to Create a Concept of Operations Document in a CBTC Application (Full Video)

Komentáře

  • @aparajaakhila4055
    @aparajaakhila4055 Před 24 dny

    Very useful. GOA 2 used in Hyderabad metro in INDIA

  • @sathishbalu100
    @sathishbalu100 Před měsícem

    Well explained sir, lots of thanks for sharing

  • @Dineshkumar-wy2nf
    @Dineshkumar-wy2nf Před měsícem

    Thanks for your effort

  • @kotipallisivaji1
    @kotipallisivaji1 Před 2 měsíci

    thank you for the efforts .more helpful

  • @fhs7838
    @fhs7838 Před 3 měsíci

    It's pretty interesting to see train integrity check is only at GoA4. Most CBTC system, due to moving block, need train integrity check to clear the "block".

  • @asmathnisa4626
    @asmathnisa4626 Před 4 měsíci

    a thorough explanation on CBT C system and its components and their current application across the world .....congrats on your effort expecting more videos in future

  • @ksba2000
    @ksba2000 Před 5 měsíci

    Is the course available? The link doesn't work

    • @CBTCSolutions
      @CBTCSolutions Před 2 měsíci

      I updated the link above. Please have a look.

  • @Asestar
    @Asestar Před 7 měsíci

    Really appreciate the clear, concise and calm explanation of the topic.

  • @ankit41395
    @ankit41395 Před 9 měsíci

    in case of tripping of person, the train may be prevented to move by using the PSD system which will not allow the PSD to move and may allow the OCC operator to find out the reason of not closing the doors. As the PSD doors have Lazer sensors which will detect the obstruction or in case of no sensor the PSD doors may be of L-channel which will reduce the gap between PSD doors and Train door. Therefore, incase of tripping the passenger, his half of the body will obstruct either the saloon door or mostly chances of obstructing the PSD doors.

  • @Srinivas0503
    @Srinivas0503 Před rokem

    Good info

  • @Srinivas0503
    @Srinivas0503 Před rokem

    Good information

  • @Srinivas0503
    @Srinivas0503 Před rokem

    Good

  • @mageshsinfo
    @mageshsinfo Před rokem

    What is Guideway??

  • @soorajkb7413
    @soorajkb7413 Před rokem

    Informative

  • @Gary-wp1wt
    @Gary-wp1wt Před rokem

    GOA 2 PARIS METRO .. LINE 6

  • @Gary-wp1wt
    @Gary-wp1wt Před rokem

    GOA2 : ONLY DOOR CLOSING BY DRIVER..

  • @kamangareats2228
    @kamangareats2228 Před rokem

    Great work Mr Naeem but the course is too expensive, I think it should be a free online course.

    • @CBTCSolutions
      @CBTCSolutions Před rokem

      Thank you for your comment Mr. Kamangar but developing original content like this cannot be developed for free, especially when you consider that there is very little written or taught about CBTC. The cost for this course is very reasonable in the field of corporate training and developing an animated course is expensive. If I had to offer this for free, I would not have created this course considering the time, effort and money I spent. Take Care.

  • @Srinivas0503
    @Srinivas0503 Před rokem

    Thank you for explanation

  • @Tarek3332
    @Tarek3332 Před rokem

    Well explained again

  • @Tarek3332
    @Tarek3332 Před rokem

    Very informative

  • @Tarek3332
    @Tarek3332 Před rokem

    Very good Concept. In densely populated South East Asia on main lines this will be the future.

  • @australianprofessionalnetw1870

    In Melbourne, Australia Metro Tunnel Project MTP is rolling out CBTC GoA2 on Pakenham Cranbourne and Sunbury lines and same will extend to Melbourne Airport Rail Link in near future

  • @nsgupta
    @nsgupta Před 2 lety

    Platform Screen Doors, Manual Screen doors for entry to Trackside and interlocked with Signaling, Emergency Trip Switch(Traction), Emergency Stop Plunger( For Signaling Braking), and Staff protection Key system( creating safe zones for a staff working on Track and interlocked with Traction OFF) are normally implemented even in GOA 2 system. Does that mean that only an Intrusion detection system is to be introduced to migrate to GOA3?

  • @alandesti2556
    @alandesti2556 Před 2 lety

    🤭 pքɾօʍօʂʍ

  • @Smaddoc1
    @Smaddoc1 Před 2 lety

    Thanks for sharing. There are lots of GoA 2 systems as far as I am aware. Just in the UK there is the Northern Line, Jubilee Line, Victoria Line and others.

  • @wattoman28
    @wattoman28 Před 2 lety

    This was excellent 👏

  • @barrychen9009
    @barrychen9009 Před 2 lety

    Thanks for your sharing, My understanding is that the GOA 3 and GOA 4 for Signaling system has nothing to do right? But only train attendant required in GOA 3 and fully automation in GOA 4. In this case if extra work is needed for on board Communication System?

  • @ahdar3605
    @ahdar3605 Před 2 lety

    Excellent presentation. Thank you for sharing.

  • @randyblu25
    @randyblu25 Před 3 lety

    In Toronto (as you know) the TTC is in the very slow process of changing line 1 to ATC. What all does ATC cover besides train movement? (and i have got to say i LOVE the fact the system stops the train at stations so smoothly without using the full brake like on line 2...lol)

  • @AungWinHtutGH
    @AungWinHtutGH Před 3 lety

    Thank you so much for your excellent lecture, Sir!

  • @mohsinarju3864
    @mohsinarju3864 Před 3 lety

    Thanks

  • @anandkumarjha6945
    @anandkumarjha6945 Před 3 lety

    Sir what is cycle in signalling

  • @shashankshekhargaur8712

    I'm thankfully to you for providing such good content... Please share more knowledge content on your channel for the new engineers all around the world

  • @SandeepKumar-eu8ht
    @SandeepKumar-eu8ht Před 3 lety

    One of the best explanations on CBTC. Thanks Naeem!

  • @snappy9061
    @snappy9061 Před 3 lety

    Great presentation. Cheers

  • @kaiseri5073
    @kaiseri5073 Před 3 lety

    Amazing. Thank you :)

  • @asadbutt6246
    @asadbutt6246 Před 3 lety

    Brilliantly explained ! Thank you for sharing the information. This video has helped me a lot to understand the overview of the system and saved my time.

  • @nagabhooshanamvemula469

    Great informative.

  • @seyyidkocabay4669
    @seyyidkocabay4669 Před 3 lety

    👍🏿

  • @n.kprasad1416
    @n.kprasad1416 Před 3 lety

    Really a nice guide to cbtc.

  • @yuzhang8890
    @yuzhang8890 Před 3 lety

    In the south of China, ATP+CTCT-2 will be used on some unban railways.

  • @kkomla
    @kkomla Před 3 lety

    I knew nothing to begin with. But thanks to your presentation i learn a lot about cbtc system. Thank you

  • @aselahars1
    @aselahars1 Před 4 lety

    Very good & Educational Presenetation.

  • @ArshadAli-iv8rw
    @ArshadAli-iv8rw Před 4 lety

    Good afternoon sir can you please tell about conflicting routes in CBTC I'm the signalling student i do know about conflicting signals and conflicting points yet to know about conflicting routes plz answer my doubt sir

  • @ElumalaiS2024
    @ElumalaiS2024 Před 4 lety

    Thank you so much. It is very useful. Great top level view of CBTC in term of IEEE 1474.3. Cheers :)

  • @balrajboddu4207
    @balrajboddu4207 Před 4 lety

    very interesting and useful . many thanks for your time and interest in sharing this

  • @RAJA-nq6yj
    @RAJA-nq6yj Před 4 lety

    Treamonds overview explanation in a single webinar. Great efforts.... Kudos....

  • @BRAVOSlX
    @BRAVOSlX Před 4 lety

    thanx a lot again.

  • @awaismarwat6613
    @awaismarwat6613 Před 4 lety

    Naeem Bhai apka koi contact number ??